What you could build at UB6 9SJ: the planning rules at this address, what neighbours have built and how big, planning decisions nearby, rough costs and the value an extension adds, and how to get started. In Greenford West, Ealing.
62extensions seen within 600 m in the last 10 years
4loft conversions within 600 m in the last 10 years
49.8extensions per 1,000 homes in the neighbourhood (10 years)
● work seen on energy certificates · ● application approved · ● refused · ● pending or other · ● this postcode
The rules at this address
Houses usually have permitted development rights: some rear extensions (typically up to 3 m deep for a semi or terrace, 4 m detached), loft conversions within volume limits, and porches can go ahead without planning permission. Larger single-storey rear extensions (up to 6 m / 8 m) can use the “prior approval” neighbour scheme.
Not in a conservation area (from council registers).
No Article 4 direction recorded for this postcode.
Listed buildings need listed building consent for most changes, inside and out: check the National Heritage List.
To be certain work is permitted development, apply for a lawful development certificate (about £129 for householders in England). Building regulations apply either way.
Across England and Wales, homes extended by a typical 30 m² and then resold rose about 11.1% more than similar homes nearby over the same years (126,300 resales). How extensions pay off by size, type and region.
Single-storey rear or side extension: about £2,000–£3,000 per m² (London £2,500–£4,000), plus fees and VAT
Loft conversion: about £45,000–£75,000 for a dormer; more for a mansard or hip-to-gable
Two-storey extension: about £1,800–£2,800 per m² of new floor
Garage conversion: about £15,000–£30,000
Basement: about £3,500–£5,000 per m², London mostly
Build costs are rough 2026 ranges from industry guides, not quotes. Get three quotes for your plans.
Move or improve?
The money you don't get back either way, for the same extra space in Greenford West.
Move to a home 20 m² bigger (about £441,000)
Stamp duty on the new home
£12,050
Estate agent on yours 1.2% + VAT
£4,896
Solicitors, buying and selling
£3,000
Survey
£600
Removals
£1,500
Money gone
£22,046
Extend by 20 m²
Building, plus 15% for design, planning and contingency
£57,500
Less what it adds to your home's value 60% of the local price
−£60,600
Money gone
−£3,100
On these figures, extending loses about £25,146 less. Moving also changes the area, the schools and the commute; extending means months of building work and depends on planning.
Building costs vary a lot (a single-storey rear extension is often £2,000–£3,000 per m², more in London). How much space adds depends on the home and street: what extensions added to resale prices. A guide, not advice; nothing you type leaves this page.
Getting started
Look at what neighbours did. Open applications above to see drawings that were approved on similar houses, and who designed them.
Check the route: permitted development (with a lawful development certificate), prior approval for larger rear extensions, or full householder planning permission.
Get a measured survey and a designer: an architect, an architectural technologist or a designer who handles planning drawings.
Apply (householder permission is about £258 in England; councils aim to decide within 8 weeks).
Building regulations through the council's building control or an approved inspector, and party wall notices to neighbours if you build on or near the boundary.
Choose a builder: written quotes, a contract, staged payments, and check their insurance and references.
From energy certificates: an extension where a later certificate shows more floor space, a loft conversion where roof rooms appear. Certificates come with sales, lettings and some building work, so the year is when it was first seen.
Not every extension shows here. We only see building work when a new energy certificate is lodged, which happens when a home is sold, let or newly built. A loft or extension added since then won't appear, even with planning permission and building control sign-off, because those records aren't published as open data outside London. Missing work doesn't mean missing paperwork.
19, Millet Road, Ub6 9sg
Rear extension
Not needed / lawful
Jun 2026
262061PALHE
122, Ferrymead Avenue, Ub6 9tn
Rear extension
Approved
Jul 2026
262046HH
10, Chinnor Crescent, Ub6 9nu
Rear extension
Not needed / lawful
May 2026
261272PALHE
86, Ferrymead Avenue, Ub6 9tl
Loft or dormer
Refused
May 2026
261134HH
79, Millet Road, Ub6 9sh
Two-storey extension
Refused
May 2026
260650HH
44, Millet Road, Ub6 9sq
Rear extension
Under consideration
–
260146HH
29, Farndale Crescent, Ub6 9ll
Rear extension
Approved
Mar 2026
260277HH
7, Ferrymead Drive, Ub6 9ts
Rear extension
Approved
Mar 2026
254227HH
48, Ravenor Park Road, Ub6 9qy
Rear extension
Approved
Jan 2026
254234HH
19, Barnham Road, Ub6 9lp
Rear extension
Approved
Jan 2026
254309HH
91, Jeymer Drive, Ub6 8nt
Rear extension
Approved
Dec 2025
253397HH
3, Millet Road, Ub6 9sg
Rear extension
Approved
Oct 2025
253282HH
16, Barnham Road, Ub6 9lp
Side return or wrap-around
Approved
Oct 2025
253143HH
91, Jeymer Drive, Ub6 8nt
Rear extension
Withdrawn
Sept 2025
252448PALHE
44, Millet Road, Ub6 9sq
Rear extension
Not needed / lawful
Jul 2025
252471PALHE
7, West Close, Ub6 9pd
Two-storey extension
Approved
Jan 2026
251915HH
109, Ravenor Park Road, Ub6 9qz
Loft or dormer
Approved
Mar 2026
251913HH
16, Ferrymead Avenue, Ub6 9th
Loft or dormer
Approved
Jul 2025
251644HH
109, Ravenor Park Road, Ub6 9qz
Rear extension
Not needed / lawful
Jun 2025
251875PALHE
66a, Eastmead Avenue, Ub6 9rf
Rear extension
Not needed / lawful
May 2025
251526PALHE
125, Union Road, Ub5 6ud
Rear extension
Refused
May 2025
251200PALHE
125, Union Road, Ub5 6ud
Rear extension
Refused
May 2025
251300PALHE
71, Millet Road, Ub6 9sh
Rear extension
Approved
May 2025
251118HH
96, Greenford Gardens, Ub6 9na
Rear extension
Approved
May 2025
250939HH
78, Jeymer Drive, Ub6 8nt
Rear extension
Approved
May 2025
244766HH
57, Marnham Crescent, Ub6 9sw
Side extension
Refused
Apr 2025
250875HH
72, Eastmead Avenue, Ub6 9rg
Rear extension
Approved
Apr 2025
250735HH
96, Greenford Gardens, Ub6 9na
Loft or dormer
Approved
Apr 2025
250649HH
57, Marnham Crescent, Ub6 9sw
Rear extension
Not needed / lawful
Mar 2025
250550PALHE
1, Hedgerley Gardens, Ub6 9nt
Two-storey extension
Approved
Aug 2025
244891HH
55, Marnham Crescent, Ub6 9sw
Rear extension
Not needed / lawful
Feb 2025
244820PALHE
55, Marnham Crescent, Ub6 9sw
Loft or dormer
Approved
Mar 2025
244849HH
62, Farndale Crescent, Ub6 9lw
Garage conversion or garage
Refused
Mar 2026
244757HH
62, Farndale Crescent, Ub6 9lw
Rear extension
Approved
Feb 2025
244758HH
Householder applications validated since 2023 within 600 m. The council's page has the drawings, the decision notice and who the agent or architect was. Hover a row for the description. Source: GLA Planning London Datahub.
–
88% (76)
88%
8 weeks
Basement
–
81% (52)
83%
10 weeks
Porch or front extension
–
80% (64)
81%
8 weeks
Share of decided applications approved since 2023 (number decided in brackets). Withdrawn applications aren't counted; many are withdrawn when refusal looks likely.