What you could build at E15 2JH: the planning rules at this address, what neighbours have built and how big, planning decisions nearby, rough costs and the value an extension adds, and how to get started. In Carpenters Estate & Stratford New Town, Newham.
29extensions seen within 600 m in the last 10 years
0loft conversions within 600 m in the last 10 years
37.2extensions per 1,000 homes in the neighbourhood (10 years)
● work seen on energy certificates · ● application approved · ● refused · ● pending or other · ● this postcode
The rules at this address
Houses usually have permitted development rights: some rear extensions (typically up to 3 m deep for a semi or terrace, 4 m detached), loft conversions within volume limits, and porches can go ahead without planning permission. Larger single-storey rear extensions (up to 6 m / 8 m) can use the “prior approval” neighbour scheme.
Not in a conservation area (from council registers).
No Article 4 direction recorded for this postcode.
Listed buildings need listed building consent for most changes, inside and out: check the National Heritage List.
To be certain work is permitted development, apply for a lawful development certificate (about £129 for householders in England). Building regulations apply either way.
Telecommunication Mast Outside 341 To 353, High Street, E15 4qz
Other householder work
Refused
Jul 2026
26/01027/PRETEL
Telecommunications Opposite Unit 3 International Business Park, Rick Roberts Way, E15 2gn
Other householder work
Approved
Jan 2026
25/02583/PRETEL
Land At Burford Road, High Street Junction , E15 4qz
Other householder work
Refused
Aug 2025
25/01236/PRETEL
158, Halo, High Street, E15 2ft
Other householder work
Approved
Feb 2025
25/00005/PRECOU
How often householder applications are approved
Work
Carpenters Estate & Stratford New Town
Newham
London
Typical decision time
All householder applications
87% (30)
82% (2590)
80%
8 weeks
Loft or dormer
83% (12)
85% (1105)
81%
7 weeks
Rear extension
100% (6)
78% (523)
79%
8 weeks
Two-storey extension
–
74% (278)
72%
8 weeks
Other householder work
60% (5)
62% (177)
70%
8 weeks
Side return or wrap-around
–
96% (248)
88%
8 weeks
Windows, doors or cladding
–
93% (42)
90%
8 weeks
Outbuilding or garden room
–
82% (49)
79%
8 weeks
Side extension
–
87% (63)
86%
8 weeks
Garage conversion or garage
Cost and the value it adds
Across England and Wales, homes extended by a typical 30 m² and then resold rose about 11.1% more than similar homes nearby over the same years (124,884 resales). How extensions pay off by size, type and region.
Single-storey rear or side extension: about £2,000–£3,000 per m² (London £2,500–£4,000), plus fees and VAT
Loft conversion: about £45,000–£75,000 for a dormer; more for a mansard or hip-to-gable
Two-storey extension: about £1,800–£2,800 per m² of new floor
Garage conversion: about £15,000–£30,000
Basement: about £3,500–£5,000 per m², London mostly
Build costs are rough 2026 ranges from industry guides, not quotes. Get three quotes for your plans.
Move or improve?
The money you don't get back either way, for the same extra space in Carpenters Estate & Stratford New Town.
Move to a home 20 m² bigger (about £584,000)
Stamp duty on the new home
£19,200
Estate agent on yours 1.2% + VAT
£6,696
Solicitors, buying and selling
£3,000
Survey
£600
Removals
£1,500
Money gone
£30,996
Extend by 20 m²
Building, plus 15% for design, planning and contingency
£57,500
Less what it adds to your home's value 60% of the local price
−£71,400
Money gone
−£13,900
On these figures, extending loses about £44,896 less. Moving also changes the area, the schools and the commute; extending means months of building work and depends on planning.
Building costs vary a lot (a single-storey rear extension is often £2,000–£3,000 per m², more in London). How much space adds depends on the home and street: what extensions added to resale prices. A guide, not advice; nothing you type leaves this page.
Getting started
Look at what neighbours did. Open applications above to see drawings that were approved on similar houses, and who designed them.
Check the route: permitted development (with a lawful development certificate), prior approval for larger rear extensions, or full householder planning permission.
Get a measured survey and a designer: an architect, an architectural technologist or a designer who handles planning drawings.
Apply (householder permission is about £258 in England; councils aim to decide within 8 weeks).
Building regulations through the council's building control or an approved inspector, and party wall notices to neighbours if you build on or near the boundary.
Choose a builder: written quotes, a contract, staged payments, and check their insurance and references.
From energy certificates: an extension where a later certificate shows more floor space, a loft conversion where roof rooms appear. Certificates come with sales, lettings and some building work, so the year is when it was first seen.
Not every extension shows here. We only see building work when a new energy certificate is lodged, which happens when a home is sold, let or newly built. A loft or extension added since then won't appear, even with planning permission and building control sign-off, because those records aren't published as open data outside London. Missing work doesn't mean missing paperwork.
158, Halo, High Street, E15 2ft
Other householder work
Refused
Dec 2024
24/02281/PRECOU
63, Wise Road, Stratford, London, E15 2tg
Rear extension
Other
Oct 2024
24/00320/PRLHE_LLDC
21, 23, Broadway, E15 4bq
Other householder work
Approved
Apr 2025
24/01304/PRECOU
8, Widdin Street, E15 4ry
Side return or wrap-around
Approved
Jun 2024
24/00860/HH
Land At New Mount Street And Bridge Terrace And, Bridge Road, E15 3ln
Other householder work
Approved
Sept 2023
23/01850/PREDEM
The Stratford Centre, Multi Storey Car Park, The Mall, E15 1xa
Other householder work
Approved
Aug 2023
23/01546/PRETEL
69, Wise Road, E15 2tg
Loft or dormer
Approved
Jul 2023
23/01127/CLP
69, Wise Road, E15 2tg
Loft or dormer
Refused
May 2023
23/00550/CLP
Householder applications validated since 2023 within 600 m. The council's page has the drawings, the decision notice and who the agent or architect was. Hover a row for the description. Source: GLA Planning London Datahub.
–
77% (48)
88%
8 weeks
Basement
–
77% (31)
83%
9 weeks
Porch or front extension
–
54% (26)
81%
8 weeks
Share of decided applications approved since 2023 (number decided in brackets). Withdrawn applications aren't counted; many are withdrawn when refusal looks likely.