Loading…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Loading…
What you could build at CM8 3LE: the planning rules at this address, what neighbours have built and how big, planning decisions nearby, rough costs and the value an extension adds, and how to get started. In Great Totham, Wickham Bishops & Woodham, Maldon.
● work seen on energy certificates · ● application approved · ● refused · ● pending or other · ● this postcode
| Home | Work | Seen | Space added | Floor area | Rooms | Distance |
|---|---|---|---|---|---|---|
| Oak Cottage, Braxted Road | Extension | 2026 | +73 m² | 175 m² → 248 m² | – | 93 m |
| 14, Tiptree Road | Extension | 2026 | +91 m² | 66 m² → 157 m² | – | 488 m |
| 1, Perryfields, Kelvedon Road | Extension | 2026 | +19 m² | 115 m² → 134 m² | – | 550 m |
| Dobbins, Carters Lane | Extension | 2025 | +101 m² | 172 m² → 273 m² | 6 → 9 | 138 m |
| 55, Kelvedon Road | Loft conversion | 2024 | – | 92 m² → 91 m² | 5 → 5 | 321 m |
| 30, Tiptree Road | Extension | 2024 | +97 m² | 96 m² → 193 m² | 4 → 8 | 488 m |
Planning applications outside London aren't published as open data yet, so search the council's own register: the drawings, decision and the agent are there. Find your council's planning register on GOV.UK ↗
Across England and Wales, homes extended by a typical 30 m² and then resold rose about 11.1% more than similar homes nearby over the same years (124,884 resales). How extensions pay off by size, type and region.
Build costs are rough 2026 ranges from industry guides, not quotes. Get three quotes for your plans.
The money you don't get back either way, for the same extra space in Great Totham, Wickham Bishops & Woodham.
| Stamp duty on the new home | £19,750 |
|---|---|
| Estate agent on yours 1.2% + VAT | £7,344 |
| Solicitors, buying and selling | £3,000 |
| Survey | £600 |
| Removals | £1,500 |
| Money gone | £32,194 |
| Building, plus 15% for design, planning and contingency | £57,500 |
|---|---|
| Less what it adds to your home's value 60% of the local price | −£51,000 |
| Money gone | £6,500 |
On these figures, extending loses about £25,694 less. Moving also changes the area, the schools and the commute; extending means months of building work and depends on planning.
Building costs vary a lot (a single-storey rear extension is often £2,000–£3,000 per m², more in London). How much space adds depends on the home and street: what extensions added to resale prices. A guide, not advice; nothing you type leaves this page.
Find help: RIBA Find an Architect ↗ · CIAT architectural technologists ↗ · TrustMark tradespeople ↗ · Federation of Master Builders ↗ · Planning Portal guides ↗
General guidance, not planning or legal advice. Fees and rules as checked in October 2026; confirm with the council.
Energy certificates: MHCLG (OGL). Planning applications: GLA Planning London Datahub. Conservation areas and Article 4: planning.data.gov.uk (OGL).
| Extension |
| 2024 |
| +27 m² |
| 150 m² → 177 m² |
| – |
| 550 m |
| The Elms, Kelvedon Road | Extension | 2023 | +77 m² | 221 m² → 298 m² | – | 550 m |
| Caper Cottage, Goat Lodge Road | Extension | 2022 | +313 m² | 241 m² → 554 m² | 7 → 12 | 474 m |
| Little Braxted House, Braxted Road | Extension | 2020 | +316 m² | 53 m² → 369 m² | 2 → 9 | 574 m |
| Conifers, Beacon Hill | Extension | 2019 | +44 m² | 250 m² → 294 m² | – | 269 m |
| 36, Kelvedon Road | Extension | 2019 | +60 m² | 80 m² → 140 m² | 4 → 7 | 343 m |
| Timoneer, Kelvedon Road | Extension | 2017 | +169 m² | 192 m² → 361 m² | – | 0 m |
| 16, Beacon Hill | Extension | 2017 | +189 m² | 336 m² → 525 m² | – | 269 m |
From energy certificates: an extension where a later certificate shows more floor space, a loft conversion where roof rooms appear. Certificates come with sales, lettings and some building work, so the year is when it was first seen.
Not every extension shows here. We only see building work when a new energy certificate is lodged, which happens when a home is sold, let or newly built. A loft or extension added since then won't appear, even with planning permission and building control sign-off, because those records aren't published as open data outside London. Missing work doesn't mean missing paperwork.