Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
342hours of spills in 2025 between them (typical neighbourhood: about 36)
97spill events counted
Severn Trent Water
Bingham Road Csointo Trib Of River Trent95 spills, 338 hours in 2025
1.6 km away
Severn Trent Water
Sydney Grove Sewage Pumping Stationinto Unnamed Trib River Trent2 spills, 5 hours in 2025
23 planned, approved or being built and 12 running (46 MW between them). Those within 5 km are on the map above.
Solar farm
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024 2.7 km away
Battery storage
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024 2.7 km away
Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025 2.8 km away
Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025 2.8 km away
Solar farm
Radcliffe Road, Holme Pierrepont - Solar FarmApproved, not yet built · 4 MW
Dec 2022 3.1 km away
Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025 3.2 km away
Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023 3.7 km away
Hydro
Gunthorpe WeirApproved, not yet built · 300 kW
Mar 2019 5.1 km away
Rooftop solar
Monarch Education Furniture - Solar panelsApproved, not yet built · 880 kW
Mar 2024 5.9 km away
Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025 6.0 km away
Solar farm
Road and street works within 1 km
2 permitted works running now or planned.
Standard
Shelford Road, Radcliffe On TrentUtility asset works · Zayo Europe · Two-way signals
Oct 2026 to Oct 2026 900 m away
Minor
Cropwell Road, Radcliffe On TrentWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 17.7 km away
Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 24.4 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.