What's changing near M7 3EB
Within 2 km, around Kersal Dale in Salford. Building, planning, schools, transport, prices and crime.
44new homes completed within 2 km, last 2 years
139homes given permission on brownfield sites since 2021
+12.5%like-for-like prices in Kersal Dale, 2024 → 2025 (council +2.3%)
–crime data not published here (Greater Manchester)
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
24 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - School closed
School closed: Toras MosheOther independent school, other independent school (closure)
Feb 2024
1.4 km away - New schoolOct 2023
1.2 km away - Planning permission
Permission for 1 home189 Littleton Road Salford M7 3TL (full planning permission)
Aug 2023
1.7 km away - New school
New school: Talmud Torah D'chassidie BelzOther independent school, other independent school
Jun 2023
1.8 km away - Planning permissionDec 2022
300 m away - New school
New school: Toras MosheOther independent school, other independent school
Oct 2022
1.4 km away - Planning permission
Permission for 4 homes18 Marston Road Salford M7 4ER (full planning permission)
Sept 2022
1.4 km away - Planning permission
Permission for 1 home8 Ralston Close Salford M7 4QQ (full planning permission)
May 2022
1.6 km away - Planning permission
Permission for 8 homesPark Lea Court Upper Park Road Salford (full planning permission)
23homes extended 2021–2025, typically adding 24 m²
57since energy certificates began (2008)
2in M7 3EB itself
- Extendedcertificate 2026
- Extendedcertificate 2022
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
19storm overflows within 2 km
438hours of spills in 2025 between them (typical neighbourhood: about 36)
325spill events counted
- United Utilities
Agecroft Power Station Csointo The River Irwell73 spills, 125 hours in 2025
1.5 km away - United Utilities
Rainsough Brow Csointo River Irwell42 spills, 101 hours in 2025
1.3 km away - United Utilities
Langley Road Csointo River Irwell32 spills, 34 hours in 2025
1.8 km away - United Utilities
Laundry St/Duchy Rd Csointo River Irwell Via Sws27 spills, 33 hours in 2025
1.8 km away - United Utilities
Radford Street Csointo River Irwell Via Sws30 spills, 31 hours in 2025
650 m away - United Utilities
Littleton Road Csointo The River Irwell23 spills, 31 hours in 2025
1.7 km away - United Utilities
Carr Clough Cso 091iginto Prestwich Clough Clvrt Irwell35 spills, 27 hours in 2025
1.7 km away - United Utilities
Bury New Road Csointo Singleton Brook27 spills, 24 hours in 2025
200 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
80 planned, approved or being built and 13 running (78 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Broughton Hub, Rigby Street - Solar PanelsApproved, not yet built · 190 kW
Nov 2024
1.3 km away - Hydro
Charlestown WeirApproved, not yet built · 200 kW
Mar 2019
1.8 km away - Rooftop solar
Jj Food Service, 1A Lamplight Way - Solar panelsApproved, not yet built · 400 kW
Nov 2023
2.0 km away - Rooftop solar
Polyflor Limited, Prestwich Delivery Office - Solar PanelsApproved, not yet built
Jul 2025
2.3 km away - Rooftop solar
The Albion Academy, London Street - Solar PanelsApproved, not yet built · 220 kW
Oct 2025
2.3 km away - Rooftop solar
Sainsburys Supermarkets, Heaton Park Road - Solar PanelsPlanning application in · 290 kW
May 2026
3.4 km away - Rooftop solar
Riverside Works, Collyhurst Road - Solar PanelsApproved, not yet built · 460 kW
Feb 2026
3.6 km away - Rooftop solar
City Of Salford Highway Services, Swinton Hall Road - Solar PanelsApproved, not yet built · 170 kW
Jul 2023
3.7 km away - Rooftop solar
Brunel Avenue - Solar PanelsPlanning application in · 170 kW
Jan 2026
3.7 km away - Rooftop solar
The Printworks, Withy Grove - Solar PanelsApproved, not yet built · 220 kW
Aug 2025
4.0 km away
Road and street works within 1 km
6 permitted works running now or planned, 2 of them major.
- Major
Chandos Road, PrestwichUtility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026
500 m away - Major, planned
Singleton Road, SalfordHighway improvement works · SALFORD CITY COUNCIL · Two-way signals
Jan 2027 to Apr 2027
1000 m away - Standard
Cavendish Road, SalfordDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026
750 m away - Immediate - urgent
Moorside Road, SalfordHighway repair and maintenance works · SALFORD CITY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026
250 m away - Minor
Bland Road, PrestwichUtility repair and maintenance works · BT · Multi-way signals
Oct 2026 to Oct 2026
600 m away - Minor
Bury New Road, SalfordRemedial works · TRANSPORT FOR GREATER MANCHESTER · Two-way signals
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2025
3.9 km away - Decideddecided Nov 2022
18.8 km away - Decideddecided Aug 2014
21.2 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027
22.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Salford Refuse Treatment Plant (AD) (anaerobic digestion, 2.5 km); Clifton Hall (landfill gas, 2.8 km); Central Park - Solar photovaltics (rooftop solar, 4.8 km); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 6.2 km); The National Cycling Centre Velodrome (rooftop solar, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.