Country England and Wales › Region North West › Council Manchester › Neighbourhood Beswick, Eastlands & Openshaw Park › Postcode M11 4FL What's changing near M11 4FL Within 2 km, around Beswick, Eastlands & Openshaw Park in Manchester. Building, planning, schools, transport, prices and crime.
153 new homes completed within 2 km, last 2 years
787 homes given permission on brownfield sites since 2021
-0.2% like-for-like prices in Beswick, Eastlands & Openshaw Park, 2024 → 2025 (council +3.2%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school New school: Ravensbury Community School Academy sponsor led, primary
planned Apr 2027 150 m away New homes 10 new homes completed houses · Aug 2026
Aug 2026 1.6 km away New homes 7 new homes completed flats · Jul 2026
Jul 2026 2.0 km away New homes 21 new homes completed houses · May 2025 – Sep 2025
Sept 2025 1.5 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.5 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.5 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.5 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.4 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.4 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.4 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.4 km away New homes 12 new homes completed 4 flats, 8 houses · May 2025 – Jun 2025
Jun 2025 1.1 km away New homes 5 homes extended 2021–2025, typically adding 19 m²
28 since energy certificates began (2008)
1 in M11 4FL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 16 storm overflows within 2 km
288 hours of spills in 2025 between them (typical neighbourhood: about 36)
94 spill events counted
United Utilities Clayton Bridge into River Medlock 42 spills, 173 hours in 2025
1.4 km away United Utilities Failsworth Wwtw into The River Medlock 8 spills, 56 hours in 2025
2.0 km away United Utilities Gorton Road (Lighting Tower) into Corn Brook 7 spills, 27 hours in 2025
1.8 km away United Utilities Parrott Street/Bromlow Street Cso into Corn Brook Via Sws 19 spills, 23 hours in 2025
950 m away United Utilities Assheton Road Cso 281ca into Clvrt Trib Of River Mersey 11 spills, 5 hours in 2025
1.3 km away United Utilities Junction Of Ashton New Road Cso into Culverted Tributary Of Corn Brook 1 spills, 2 hours in 2025
1.8 km away United Utilities Lord North Street/Clifton St Cso into Shooters Brook 4 spills, 1 hours in 2025
1.4 km away United Utilities Junction Of Graver Ln Elsma Rd Cso into Berry Brow Culvert 1 spills, 0 hours in 2025
1.3 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 103 planned, approved or being built and 15 running (120 MW between them). Those within 5 km are on the map above.
Rooftop solar The National Cycling Centre - Solar Photovoltaic Panels Being built · 920 kW
Aug 2022 350 m away Solar farm City Football Academy - Solar Panels Approved, not yet built · 1 MW
Dec 2024 750 m away Rooftop solar G H Sheldon, Stainburn Road - Solar Panels Approved, not yet built · 290 kW
Jul 2023 1.0 km away Rooftop solar Unit C, Kelbrook Road - Solar Panels Approved, not yet built · 610 kW
Aug 2023 1.2 km away Rooftop solar Etihad Stadium, Ashton New Road - Solar Panels Approved, not yet built · 220 kW
May 2025 1.2 km away Rooftop solar East Manchester Academy, Grey Mare Lane - Solar Panels Approved, not yet built · 230 kW
Sept 2025 1.2 km away Rooftop solar Ashton Old Road - Solar Panels Approved, not yet built · 390 kW
Jun 2022 1.5 km away Rooftop solar Duo Plastics Limited, Vickers Street - Solar Panels Planning application in · 560 kW
Sept 2024 1.7 km away Rooftop solar New Smithfield Market, Whitworth Street East -Solar Panels Approved, not yet built · 270 kW
Dec 2024 1.7 km away Rooftop solar New Smithfield Market - Solar Panels Approved, not yet built · 160 kW
Dec 2024 1.7 km away Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major, planned Alan Turing Way, Manchester Utility repair and maintenance works · EE Ltd · Lane closure
Nov 2026 to Nov 2026 900 m away Major, planned Acton Avenue, Manchester Disconnection or alteration of supply · United Utilities Water Ltd · Road closure
Dec 2026 to Dec 2026 900 m away Major Scotland Hall Road, Manchester Highway improvement works · MANCHESTER CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 1000 m away Minor Hackle Street, Manchester Remedial works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Nov 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 8.6 km away Decided decided Nov 2022 12.3 km away Decided decided Aug 2014 21.6 km away Pre-application Intermodal Logistics Park North Rail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027 26.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The National Cycling Centre Velodrome (rooftop solar, 450 m); City Football Academy, Ashton New Road - Solar panels (rooftop solar, 750 m); Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) (energy from waste, 2.0 km); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 2.0 km); Outer Space Studios Solar Panels (rooftop solar, 2.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.