What's changing near LS28 7PX
Within 2 km, around Pudsey South West in Leeds. Building, planning, schools, transport, prices and crime.
54new homes completed within 2 km, last 2 years
7homes given permission on brownfield sites since 2021
+6.7%like-for-like prices in Pudsey South West, 2024 → 2025 (council +3.8%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedflats · Sep 2026
Sept 2026
1.3 km away - New school
New school: Helm Academy PudseyOther independent special school, other independent special school
Sept 2026
1.5 km away - New homes
5 new homes completedflats · Sep 2026
Sept 2026
1.7 km away - New homes
24 new homes completed3 flats, 21 houses · Jun 2025 – Feb 2026
Feb 2026
1.7 km away - School closed
School closed: Fulneck SchoolOther independent school, other independent school (closure)
Jul 2025
1.8 km away - New homes
5 new homes completedhouses · Dec 2024
Dec 2024
1.9 km away - Planning permissionJun 2022
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 28 m²
25since energy certificates began (2008)
0in LS28 7PX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
342hours of spills in 2025 between them (typical neighbourhood: about 36)
188spill events counted
- Yorkshire Water
Dawsons Corner Csointo Tributary Of Bagley Beck48 spills, 100 hours in 2025
1.1 km away - Yorkshire Water
Stanningley Csointo Farsley Beck (Culverted)49 spills, 68 hours in 2025
1.4 km away - Yorkshire Water
Dick Lne Cso & New Lne Spsinto Cul Trib Of Tyersal Beck19 spills, 64 hours in 2025
1.3 km away - Yorkshire Water
Lowtown Csointo Clvrtdtrib Of Pudsey Beck37 spills, 52 hours in 2025
1.8 km away - Yorkshire Water
Pudsey (Smalewell) Csointo Tyersal Beck18 spills, 44 hours in 2025
550 m away - Yorkshire Water
Spring Valley No2 Csointo Farsley Beck16 spills, 13 hours in 2025
1.4 km away - Yorkshire Water
Fulneck Csointo Farsley Beck1 spills, 1 hours in 2025
2.0 km away - Yorkshire Water
Richardshaw Lane No2 Csointo Farsley Beck (Culverted)0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
60 planned, approved or being built and 5 running (6 MW between them). Those within 5 km are on the map above.
- Rooftop solar
New Street Mills, Carlisle Road - Solar PanelsApproved, not yet built
Oct 2025
1.2 km away - Rooftop solar
Pudsey Leisure Centre - Solar PanelsApproved, not yet built · 250 kW
Feb 2024
1.3 km away - Rooftop solar
Spring Valley Mills - Solar PanelsApproved, not yet built · 380 kW
Apr 2022
1.6 km away - Rooftop solar
Crawshaw Academy, Robin Lane - Solar PanelsApproved, not yet built · 200 kW
May 2023
1.7 km away - Rooftop solar
West Specialist Inclusive Learning Centre, Town Street - Solar PV PanelsApproved, not yet built · 240 kW
Jun 2024
2.1 km away - Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024
2.3 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024
3.2 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024
3.2 km away - Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024
3.4 km away - Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
3.5 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
24.4 km away - Decideddecided Oct 2015
27.3 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
27.4 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
27.9 km away - Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation decided Mar 2024
29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 4.5 km); Esholt WWTW (other, 5.9 km); Buslingthorpe Power Station (Leeds North) (biomass, 9.4 km); Regent Street, Sheepscar - Solar Panels (rooftop solar, 9.8 km); TF and JH Braime Holdings Factory (rooftop solar, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.