Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
60hours of spills in 2025 between them (typical neighbourhood: about 36)
25spill events counted
Yorkshire Water
Temple Avenue Csointo Trib Of Wyke Beck25 spills, 60 hours in 2025
1.9 km away
Yorkshire Water
Cross Gates Csointo Trib Of Wyke Beck (Culverted)0 spills, 0 hours in 2025
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 12.9 km away
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 13.5 km away
Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
12 new homes completedhouses · Aug 2025 – Oct 2025
Oct 2025 1.9 km away
New homes
12 new homes completedhouses · Jun 2025 – Sep 2025
Sept 2025 1.8 km away
New homes
27 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025 1.7 km away
New homes
11 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025 1.9 km away
New homes
5 new homes completedhouses · Nov 2024 – Mar 2025
Mar 2025 1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 22 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Temple House, 1 Beechwood Car Space - Solar PV PanelsApproved, not yet built · 660 kW
Feb 2025 4.4 km away
Rooftop solar
Manheim Car Auctions, Rothwell - Solar PanelsApproved, not yet built · 180 kW
Oct 2025 4.4 km away
Running nearest: Skelton Grange Landfill (landfill gas, 2.3 km); Knostrop Sewage Treatment Works (anaerobic digestion, 3.5 km); Cross Green ERF (energy from waste, 4.1 km); Knostrop WWTW AD (anaerobic digestion, 4.5 km); LVF Packaging - Solar Panel (rooftop solar, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
application due in February 2026 17.7 km away
Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 22.5 km away
Decided
Helios Renewable Energy ProjectGenerating Stations · Land to the south west of the village of Camblesforth and to the north of the village of Hirst Court
decided Dec 2025 27.0 km away
Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.