Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
2,308hours of spills in 2025 between them (typical neighbourhood: about 36)
263spill events counted
Yorkshire Water
City Square Csointo River Aire103 spills, 1,974 hours in 2025
650 m away
Yorkshire Water
Driver Terrace Csointo River Aire80 spills, 198 hours in 2025
1.2 km away
Yorkshire Water
St Pauls Street Csointo River Aire18 spills, 50 hours in 2025
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 19.0 km away
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 19.6 km away
Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
New-home postcodes with fewer than 5 homes are counted above but not listed. 42 postcodes nearby had new homes completed in the last two years.
Network House, Beeston - Solar PanelsApproved, not yet built · 410 kW
Jan 2024 2.6 km away
Battery storage
Gelderd Road, Beeston - Battery StorageApproved, not yet built
Jul 2023 2.7 km away
Running nearest: TF and JH Braime Holdings Factory (rooftop solar, 1.1 km); LVF Packaging - Solar Panel (rooftop solar, 1.7 km); Regent Street, Sheepscar - Solar Panels (rooftop solar, 1.9 km); Buslingthorpe Power Station (Leeds North) (biomass, 2.8 km); Knostrop WWTW AD (anaerobic digestion, 3.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major
Water Lane, LeedsHighway improvement works · LEEDS CITY COUNCIL · Multi-way signals
Sept 2026 to Oct 2026 350 m away
Major
Water Lane, LeedsHighway improvement works · LEEDS CITY COUNCIL · Road closure
Jul 2026 to Sept 2027 450 m away
Major, planned
Hunslet Road, LeedsHighway improvement works · LEEDS CITY COUNCIL · Multi-way signals
Oct 2026 to Jan 2027 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
application due in February 2026 24.5 km away
Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 29.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.