Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
17hours of spills in 2025 between them (typical neighbourhood: about 36)
12spill events counted
Yorkshire Water
Yws Unknown Sites Defaultinto Varies With Outlet4 spills, 14 hours in 2025
1.6 km away
Yorkshire Water
Deveron Grove No 2 Csointo Clayton Dike7 spills, 3 hours in 2025
1.8 km away
Yorkshire Water
Castlegate Bradford Csointo Culv Trib Of Hebble Beck1 spills, 1 hours in 2025
1.9 km away
Yorkshire Water
Crescent Road Csointo Tributary Of Grimscar Dike0 spills, 0 hours in 2025
30 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023 1.4 km away
Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024 1.5 km away
Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023 1.6 km away
Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025 1.9 km away
Rooftop solar
John Smiths Stadium, Huddersfield Town - Solar PanelsApproved, not yet built · 500 kW
Sept 2025 2.1 km away
Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024 2.4 km away
Solar farm
Cummins Turbo Technology, St Andrews Road - Solar PV CanopiesPlanning application in
Mar 2026 2.6 km away
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar PanelsApproved, not yet built · 930 kW
Jul 2023 2.6 km away
Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025 2.6 km away
Rooftop solar
Cummins Turbo Technologies, St Andrews Road - Solar panelsApproved, not yet built · 450 kW
Jul 20242.7 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major, planned
Ashbrow Road, HuddersfieldNew service connection · YORKSHIRE WATER · Road closure
Oct 2026 to Oct 2026 750 m away
Standard
Service Road Fronting 333 To 381 Bradford Road, HuddersfieldNew service connection · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Cowcliffe & South Fixby: +25% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.