What's changing near DN6 7RH
Within 2 km, around Adwick le Street & Woodlands in Doncaster. Building, planning, schools, transport, prices and crime.
13new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.9%like-for-like prices in Adwick le Street & Woodlands, 2024 → 2025 (council +3.7%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 17 m²
10since energy certificates began (2008)
0in DN6 7RH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
265hours of spills in 2025 between them (typical neighbourhood: about 36)
74spill events counted
- Yorkshire Water
Adwick No.2 Stwinto Mill Dike21 spills, 155 hours in 2025
1.3 km away - Yorkshire Water
Woodlands Doncaster Road Csointo Mill Dike26 spills, 73 hours in 2025
1.3 km away - Yorkshire Water
Great North Road Adwick Csointo Mill Dike16 spills, 32 hours in 2025
1.6 km away - Yorkshire Water
War Memorial No 2 Csointo Tributary Of Langthwaite Dyke11 spills, 5 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
36 planned, approved or being built and 9 running (35 MW between them). Those within 5 km are on the map above.
- Battery storage
Woodlands - Battery Energy StorageApproved, not yet built · 1 MW
Jul 2022
1.2 km away - Rooftop solar
Don Valley Academy, Jossey Lane - Solar PV PanelsApproved, not yet built · 300 kW
Dec 2025
2.1 km away - Solar farm
Croft Farm, Askern Road - Solar Array & Hydrogen PlantBeing built · 3 MW
May 2023
2.5 km away - Hydrogen
Croft Farm, Askern Road - Solar Array & Hydrogen PlantApproved, not yet built · 900 kW
May 2023
2.5 km away - Solar farm
The Balk, Almholme - Solar FarmApproved, not yet built · 50 MW
Oct 2024
4.1 km away - Battery storage
The Balk, Almholme - Energy Storage SystemApproved, not yet built · 1,025 MW
Oct 2024
4.1 km away - Solar farm
Butt Lane, Hooton Pagnell - Solar FarmPlanning application in · 50 MW
Dec 2025
5.0 km away - Battery storage
Butt Lane, Hooton Pagnell Battery Energy StoragePlanning application in · 30 MW
Dec 2025
5.0 km away - Battery storage
Cutts Bros, Wharf Road - Battery Storage FacilityApproved, not yet built · 50 MW
Oct 2024
5.2 km away - Rooftop solar
Premier Logistics Park, Churchill Road - Solar PV PanelsApproved, not yet built
Feb 2026
5.3 km away
Road and street works within 1 km
10 permitted works running now or planned, 7 of them major.
- Major
Princess Street, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
200 m away - Major
Woodlands Road, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
300 m away - Major
Recreation Road, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Major
Cemetery Road, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Major
Windmill Balk Lane, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Oct 2026
850 m away - Major
Great North Road Service Road North Of Ridge Balk Lane, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
950 m away - Major
Windmill Balk Lane, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Dec 2026
1000 m away - Standard
Grosvenor Road, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Oct 2026
850 m away - Standard
Washington Road, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Major infrastructure projects within 30 km
- Decideddecided Oct 2012
5.6 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
11.3 km away - Decideddecided Mar 2016
14.1 km away - Decideddecided Mar 2015
16.5 km away - Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire decided Sept 2018
17.4 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
18.2 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Marr Windfarm (wind farm, 4.4 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 4.5 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 4.5 km); Hampole Wind Farm (wind farm, 4.5 km); Skelbrooke Landfill Gas Project (landfill gas, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.