Country England and Wales › Region South West › Council Wiltshire › Neighbourhood Staverton, Hilperton & Semington › Postcode BA14 6LP What's changing near BA14 6LP Within 2 km, around Staverton, Hilperton & Semington in Wiltshire. Building, planning, schools, transport, prices and crime.
120 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.8% like-for-like prices in Staverton, Hilperton & Semington, 2024 → 2025 (council +2.1%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 33 new homes completed 1 flats, 32 houses · Nov 2024 – Oct 2026
Oct 2026 1.8 km away New homes 54 new homes completed 1 flats, 53 houses · Oct 2024 – Sep 2026
Sept 2026 1.8 km away New homes 18 new homes completed houses · Oct 2025 – Apr 2026
Apr 2026 300 m away New homes 8 new homes completed houses · Dec 2024 – Apr 2025
Apr 2025 1.8 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
7 homes extended 2021–2025, typically adding 35 m²
9 since energy certificates began (2008)
0 in BA14 6LP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 3 storm overflows within 2 km
281 hours of spills in 2025 between them (typical neighbourhood: about 36)
25 spill events counted
Wessex Water Semington Brook Pumping Station into Semington Brook (S) 13 spills, 184 hours in 2025
500 m away Wessex Water Semington Road Pumping Station into (S) Berryfield Brook 6 spills, 49 hours in 2025
1.9 km away Wessex Water Great Hinton Pumping Station into Tributary Of Semington Brook 6 spills, 48 hours in 2025
2.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 30 planned, approved or being built and 21 running (226 MW between them). Those within 5 km are on the map above.
Rooftop solar Herman Miller, Portal Road - Solar Panels Approved, not yet built · 580 kW
Apr 2023 1.6 km away Rooftop solar Knorr Bremse Rail Systems Uk, Westinghouse Way - Solar Panels Approved, not yet built · 420 kW
Jun 2026 1.8 km away Solar farm Whaddon Lane, Hilperton Approved, not yet built · 25 MW
Apr 2022 2.1 km away Battery storage Whaddon Lane, Hilperton Approved, not yet built · 18 MW
Apr 2022 2.1 km away Battery storage Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility Approved, not yet built · 150 MW
Jan 2023 3.7 km away Rooftop solar Apetito, Canal Road - Solar Panels Approved, not yet built · 720 kW
Sept 2024 3.9 km away Rooftop solar Apetito, Canal Road - Solar Panels Approved, not yet built · 1 MW
Sept 2024 3.9 km away Rooftop solar Tesco, County Way - Solar Photovoltaic Panels Approved, not yet built · 150 kW
Mar 2026 4.6 km away Solar farm Studley Farm - Solar Farm & Battery Storage Approved, not yet built · 50 MW
Jun 2022 5.2 km away Battery storage Studley Farm - Solar Farm & Battery Storage Approved, not yet built
Jun 2022 5.2 km away Solar farm Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Examination application due September 2025 23.1 km away Decided A303 Stonehenge Highways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023 28.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Marsh Farm Hilperton (solar farm, 2.3 km); Land north of Ashton Road (solar farm, 2.5 km); Roundponds Farm Solar Park (solar farm, 4.1 km); Norrington Common Solar Farm (solar farm, 4.5 km); CRAYSMARSH SOLAR FARM (solar farm, 4.6 km).