Finding extended homes…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Finding extended homes…
Homes within 1 km whose energy certificates show the floor area growing: extensions, loft and garage conversions. Tap a home on the map or in the list for its full history. Back to TF9 3UW
Not every extension shows here. We only see building work when a new energy certificate is lodged, which happens when a home is sold, let or newly built. A loft or extension added since then won't appear, even with planning permission and building control sign-off, because those records aren't published as open data outside London. Missing work doesn't mean missing paperwork.
| Home | Before | After | Added | Recorded |
|---|---|---|---|---|
| 15, Smithfield Road963 m away | 95 m² | 195 m² | +100 m² +105% | 2020 |
| 7, Drayton Mill Court618 m away | 82 m² | 166 m² | +84 m² +102% | 2024 |
| 65, Hampton Drive241 m away | 76 m² | 115 m² | +39 m² +51% | 2021 |
| 18, Cobblers Way718 m away | 68 m² | 106 m² | +38 m² +56% | 2026 |
| 49, Hampton Drive241 m away | 113 m² | 146 m² | +33 m² +29% | 2019 |
| 112, Longslow Road886 m away | 72 m² | 102 m² | +30 m² +42% | 2019 |
| 28, Hawthorn Way884 m away | 80 m² | 109 m² | +29 m² +36% | 2025 |
| Suilven, Prospect Road690 m away | 132 m² | 161 m² | +29 m² +22% | 2024 |
| 29, Hampton Drive241 m away | 153 m² | 182 m² | +29 m² +19% | 2022 |
| Ashlea, Ashbourne Drive497 m away | 101 m² | 128 m² | +27 m² +27% | 2023 |
| 7, Rush Lane765 m away | 67 m² | 92 m² | +25 m² +37% | 2020 |
| 48, Prospect Road690 m away | 61 m² | 83 m² | +22 m² +36% | 2017 |
| White Gates, 25, Prospect Road586 m away | 126 m² | 146 m² | +20 m² +16% | 2014 |
| 6, Longlands Lane962 m away | 99 m² | 118 m² | +19 m² +19% | 2016 |
| 106, Longslow Road886 m away | 82 m² | 100 m² | +18 m² +22% | 2014 |
| 4, Vernon Drive0 m away | 105 m² | 122 m² | +17 m² +16% | 2025 |
| 17, Damson Fayre130 m away | 103 m² | 119 m² | +16 m² +16% | 2026 |
| 26, Grosvenor Road937 m away | 80 m² | 96 m² | +16 m² +20% | 2015 |
From energy performance certificates (MHCLG): a later certificate shows at least 15 m² and 15% more floor area than an earlier one (and no more than 2.5 times, to leave out typing errors). Some changes come from a more careful measurement rather than building work. Addresses: HM Land Registry. Contains HM Land Registry data © Crown copyright and database right 2026, OGL v3.0.