Finding extended homes…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Finding extended homes…
Homes within 1 km whose energy certificates show the floor area growing: extensions, loft and garage conversions. Tap a home on the map or in the list for its full history. Back to LE9 9LU
Not every extension shows here. We only see building work when a new energy certificate is lodged, which happens when a home is sold, let or newly built. A loft or extension added since then won't appear, even with planning permission and building control sign-off, because those records aren't published as open data outside London. Missing work doesn't mean missing paperwork.
| Home | Before | After | Added | Recorded |
|---|---|---|---|---|
| 101, Desford Road486 m away | 100 m² | 187 m² | +87 m² +87% | 2022 |
| 63a, Desford Road486 m away | 105 m² | 188 m² | +83 m² +79% | 2022 |
| 101, Arnolds Crescent608 m away | 84 m² | 160 m² | +76 m² +90% | 2024 |
| 33, Desford Road486 m away | 96 m² | 161 m² | +65 m² +68% | 2019 |
| 22, Moat Close780 m away | 153 m² | 208 m² | +55 m² +36% | 2024 |
| 105, Desford Road486 m away | 119 m² | 173 m² | +54 m² +45% | 2026 |
| 9, Pasture Lane191 m away | 72 m² | 117 m² | +45 m² +63% | 2015 |
| 2, Red Lion Lane209 m away | 69 m² | 112 m² | +43 m² +62% | 2018 |
| 5, Main Street617 m away | 76 m² | 117 m² | +41 m² +54% | 2020 |
| 7, Kirkby Lane913 m away | 170 m² | 208 m² | +38 m² +22% | 2024 |
| 2, Pine Tree Close253 m away | 125 m² | 161 m² | +36 m² +29% | 2019 |
| 77a, Main Street215 m away | 114 m² | 138 m² | +24 m² +21% | 2024 |
| 20, Jubilee Road416 m away | 82 m² | 102 m² | +20 m² +24% | 2023 |
| 37, Hornbeam Road171 m away | 112 m² | 131 m² | +19 m² +17% | 2022 |
| 9, Alans Way381 m away | 82 m² | 101 m² | +19 m² +23% | 2021 |
| 30a, Main Street481 m away | 79 m² | 97 m² | +18 m² +23% | 2017 |
| 49, Sparkenhoe0 m away | 88 m² | 105 m² | +17 m² +19% | 2024 |
| 10, Brascote Lane628 m away | 71 m² | 87 m² | +16 m² +23% | 2025 |
From energy performance certificates (MHCLG): a later certificate shows at least 15 m² and 15% more floor area than an earlier one (and no more than 2.5 times, to leave out typing errors). Some changes come from a more careful measurement rather than building work. Addresses: HM Land Registry. Contains HM Land Registry data © Crown copyright and database right 2026, OGL v3.0.