Loading…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Loading…
Electric Lines near Meifod SY22, in Powys council.
As of October 2026, Green Gen Vyrnwy Frankton is at this stage: Proposed. Planned or being consulted on. It may change or never happen.
When: Application expected February 2027
An overhead line from a collector substation in Powys through the Vyrnwy Valley to a connection point on the national electricity network near Lower Frankton in Shropshire.
See the area today on Google Street View
National infrastructure projects: Planning Inspectorate and planning.data.gov.uk, Open Government Licence v3.0. Headline schemes: kept by hand from the source named on each, checked October 2026.