Generating Stations near Huntingdon CB6, in East Cambridgeshire council.
As of October 2026, Chatteris Wind Farm is at this stage: Proposed. Planned or being consulted on. It may change or never happen.
When: Application expected July 2027
An onshore wind farm comprising of up to 15 wind turbines (of a height of 220m to blade tip), electrical infrastructure including an on-site substation, transformers, switchgear, buried cabling and a Battery Energy Storage System (BESS), together with site access and highway works, temporary construction infrastructure, and landscaping, habitat management and biodiversity enhancement. The proposed development is anticipated to have an installed generating capacity of approximately 126 MW. The grid connection will not form part of the DCO application.
See the area today on Google Street View
National infrastructure projects: Planning Inspectorate and planning.data.gov.uk, Open Government Licence v3.0. Headline schemes: kept by hand from the source named on each, checked October 2026.