Loading…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Loading…
Generating Stations near Workington CA14, in Cumberland council.
As of October 2026, Dean Moor Solar Farm is at this stage: Decision made. A decision has been made. Our source doesn't say whether it was approved or refused, or whether work has started, so follow the link to check.
When: Decided July 2026
The Proposed Development comprises the construction, operation, and decommissioning of a solar energy generating station comprising solar PV arrays, an on-site grid connection, associated infrastructure, and green infrastructure with a total capacity exceeding 50 megawatts (MW). The Site is approximately 276.5ha The generating station would export electricity via an on-Site connection to the local Electricity North West Limited (as Distribution Network Operator (DNO)) grid network.
See the area today on Google Street View
National infrastructure projects: Planning Inspectorate and planning.data.gov.uk, Open Government Licence v3.0. Headline schemes: kept by hand from the source named on each, checked October 2026.