Loading…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Loading…
Generating Stations near Scunthorpe DN15, in North Lincolnshire council.
As of October 2026, North Lincolnshire Green Energy Park is at this stage: Decision made. A decision has been made. Our source doesn't say whether it was approved or refused, or whether work has started, so follow the link to check.
When: Decided March 2025
The Project consists of an Energy Recovery Facility (ERF) converting up to 650,000 tonnes per annum of Refuse Derived Fuel (RDF) to generate a maximum of 95 Mega Watts of electrical output (MWe) and/or 380 Mega Watts of thermal output (MWt) to provide power, heat and steam on the site of the operating Flixborough Wharf on the River Trent. The Project will incorporate battery storage, hydrogen production from the electrolysis of water, hydrogen storage, heat and steam storage. It will also include heat-treatment of bottom and fly ash, concrete block manufacturing, carbon dioxide capture and uti
See the area today on Google Street View
National infrastructure projects: Planning Inspectorate and planning.data.gov.uk, Open Government Licence v3.0. Headline schemes: kept by hand from the source named on each, checked October 2026.