Loading…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Loading…
Generating Stations near Leiston IP16, in East Suffolk council.
As of October 2026, East Anglia ONE North Offshore Windfarm is at this stage: Decision made. A decision has been made. Our source doesn't say whether it was approved or refused, or whether work has started, so follow the link to check.
When: Decided March 2022
An offshore wind farm which could consist of up to 67 turbines, generators and associated infrastructure, with an installed capacity of up to 800MW, located 36km from Lowestoft and 42km from Southwold. From landfall the cables will be routed underground to an onshore substation, which will in turn connect into the national electricity grid via a National Grid substation and cable sealing end compounds, the latter to be owned and operated by National Grid.
See the area today on Google Street View
National infrastructure projects: Planning Inspectorate and planning.data.gov.uk, Open Government Licence v3.0. Headline schemes: kept by hand from the source named on each, checked October 2026.