Country England and Wales › Region West Midlands › Council Wolverhampton › Neighbourhood Tettenhall North › Postcode WV6 9JT What's changing near WV6 9JT Within 2 km, around Tettenhall North in Wolverhampton. Building, planning, schools, transport, prices and crime.
10 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.6% like-for-like prices in Tettenhall North, 2024 → 2025 (council +5.4%)
-13% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
14 homes extended 2021–2025, typically adding 30 m²
31 since energy certificates began (2008)
1 in WV6 9JT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 12 storm overflows within 2 km
62 hours of spills in 2025 between them (typical neighbourhood: about 36)
79 spill events counted
Severn Trent Water Great Hampton Street Cso into Staf'Shire & Wor'Shrie Canal 37 spills, 23 hours in 2025
1.5 km away Severn Trent Water Henwood Rd/Meadow View Terrace Cso into Smestow Brook 13 spills, 17 hours in 2025
1.5 km away Severn Trent Water Barnhurst Sewage Treatment Works into Various - See Outlets 2 spills, 14 hours in 2025
1.4 km away Severn Trent Water Lane Green Pumping Station into Trib Of River Penk 4 spills, 3 hours in 2025
1.9 km away Severn Trent Water Wolverhampton - Leicester St/Gloucester St (Cso) into Smestow Brook 7 spills, 2 hours in 2025
700 m away Severn Trent Water South West Interceptor Cso into Smestow Brook 2 spills, 1 hours in 2025
1.5 km away Severn Trent Water Chapel Ash/Lovatt Street Jcn Cso into Tributary Of Smestow Brook 9 spills, 1 hours in 2025
1.2 km away Severn Trent Water Wolverhampton - Showell Road (Cso) into Smestow Brook 1 spills, 1 hours in 2025
700 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 53 planned, approved or being built and 12 running (129 MW between them). Those within 5 km are on the map above.
Rooftop solar Rakegate Primary School - Solar Panels Approved, not yet built · 200 kW
Nov 2025 1.6 km away Rooftop solar Ormiston New Academy, Marsh Lane - Solar Panels Approved, not yet built · 410 kW
Feb 2026 1.8 km away Solar farm Balliol Business Park, Balliol Road - Solar Panels Approved, not yet built · 170 kW
Mar 2024 1.9 km away Rooftop solar Sherwood House, Showell Road - Solar Panels Planning application in · 260 kW
Sept 2025 2.0 km away Rooftop solar Brindley Honda, West Street - Solar Pv System Planning application in · 190 kW
Jun 2024 2.0 km away Rooftop solar Sherwood Stainless Steel, Mammoth Drive - Solar Panels Approved, not yet built · 700 kW
Aug 2023 2.1 km away Rooftop solar Valiant Way, Pendeford - Solar Panels Approved, not yet built · 880 kW
Mar 2023 2.8 km away Battery storage Innovation Drive, Bilbrook - Micro Energy Storage Project Approved, not yet built · 200 kW
Jan 2026 2.8 km away Rooftop solar Valiant Way, Pendeford Approved, not yet built · 1 MW
Nov 2021 2.8 km away Rooftop solar University Technical College, Cambridge Street - Solar Panels Approved, not yet built
Aug 2023 3.0 km away Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 7.0 km away Decided decided May 2020 8.7 km away Decided decided Mar 2014 29.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wolverhampton EfW (energy from waste, 2.4 km); Jaguar Land Rover (rooftop solar, 2.9 km); Land East of Lawn Lane (solar farm, 3.6 km); Barr Farm (solar farm, 6.9 km); EPSRC Willenhall (battery storage, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.