Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
63hours of spills in 2025 between them (typical neighbourhood: about 36)
54spill events counted
Severn Trent Water
Wood Road/School Road Csointo River Penk/Wergs Brook31 spills, 33 hours in 2025
1.9 km away
Severn Trent Water
Wergs Sewage Pumping Stationinto Tributary Of River Penk16 spills, 27 hours in 2025
950 m away
Severn Trent Water
Lane Green Pumping Stationinto Trib Of River Penk4 spills, 3 hours in 2025
1.7 km away
Severn Trent Water
Wood Road/School Road Csointo River Penk/Wergs Brook3 spills, 0 hours in 2025
1.9 km away
Severn Trent Water
Bowen Cooke Ave Sewage Pumping Stainto River Penk0 spills, 0 hours in 2025
1.3 km away
Severn Trent Water
Coleridge Drive Spsinto River Penk0 spills, 0 hours in 2025
1.5 km away
Severn Trent Water
Wood Road/School Road Csointo River Penk/Wergs Brook0 spills, 0 hours in 2025
1.9 km away
Severn Trent Water
Wood Road/School Road Csointo River Penk/Wergs Brook0 spills, 0 hours in 2025
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Tettenhall South: +21% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.4% in two years.
Valiant Way, PendefordApproved, not yet built · 1 MW
Nov 2021 4.4 km away
Rooftop solar
i54 Project Trent - Solar PanelsApproved, not yet built · 260 kW
Oct 2023 4.5 km away
Running nearest: Jaguar Land Rover (rooftop solar, 4.3 km); Wolverhampton EfW (energy from waste, 4.4 km); Land East of Lawn Lane (solar farm, 4.8 km); Albrighton Solar farm (solar farm, 5.6 km); Albrighton Solar farm (battery storage, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.