Country England and Wales › Region West Midlands › Council Wolverhampton › Neighbourhood Castlecroft › Postcode WV6 8HH What's changing near WV6 8HH Within 2 km, around Castlecroft in Wolverhampton. Building, planning, schools, transport, prices and crime.
136 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.6% like-for-like prices in Castlecroft, 2024 → 2025 (council +5.4%)
-10% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 38 new homes completed houses · Oct 2024 – Jan 2026
Jan 2026 1.9 km away New homes 24 new homes completed houses · Oct 2025 – Jan 2026
Jan 2026 1.8 km away New homes 6 new homes completed houses · Sep 2025 – Nov 2025
Nov 2025 1.9 km away New homes 7 new homes completed houses · Jun 2025 – Sep 2025
Sept 2025 1.9 km away New homes 8 new homes completed houses · Mar 2025 – Jul 2025
Jul 2025 1.8 km away New homes 19 new homes completed houses · Feb 2025 – Jun 2025
Jun 2025 1.9 km away New homes 6 new homes completed houses · Feb 2025 – Apr 2025
Apr 2025 1.8 km away New homes 14 new homes completed houses · Oct 2024 – Dec 2024
Dec 2024 2.0 km away New school New school: Aurora Cedars School Other independent special school, other independent special school
Jun 2023 1.4 km away New school Apr 2023 1.0 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
9 homes extended 2021–2025, typically adding 41 m²
14 since energy certificates began (2008)
2 in WV6 8HH itself
Extended certificate 2025 Extended certificate 2019 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 17 storm overflows within 2 km
178 hours of spills in 2025 between them (typical neighbourhood: about 36)
115 spill events counted
Severn Trent Water Castlecroft Ln Sps Cso into Smestow Brook 6 spills, 40 hours in 2025
1.3 km away Severn Trent Water Wood Road/School Road Cso into River Penk/Wergs Brook 31 spills, 33 hours in 2025
400 m away Severn Trent Water Bridgnorth Road Cso into Smestow Brook 5 spills, 31 hours in 2025
950 m away Severn Trent Water Wergs Sewage Pumping Station into Tributary Of River Penk 16 spills, 27 hours in 2025
1.8 km away Severn Trent Water Henwood Rd/Meadow View Terrace Cso into Smestow Brook 13 spills, 17 hours in 2025
2.0 km away Severn Trent Water Compton - Opp 14 Bridgnorth Rd (Cso) into Smestow Brook 12 spills, 15 hours in 2025
950 m away Severn Trent Water Compton Park Cso into Graiseley Brook 10 spills, 13 hours in 2025
1.4 km away Severn Trent Water Bradmore Jeffcock/Rayleigh Rd Cso into Tributary Of Graiseley Brook 15 spills, 2 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 48 planned, approved or being built and 11 running (70 MW between them). Those within 5 km are on the map above.
Battery storage South Staffordshire Railway Walk, Castlecroft - Battery Storage Approved, not yet built · 50 MW
Aug 2022 2.2 km away Battery storage Pool Hall Farm, Lower Penn - Battery Storage Approved, not yet built · 100 MW
Jul 2025 2.2 km away Battery storage Penstone Lane, Penn 1 - Battery Storage Facility Approved, not yet built · 50 MW
Sept 2022 3.5 km away Battery storage Penstone Lane, Lower Penn 2 - Battery Storage Approved, not yet built · 50 MW
Sept 2022 3.5 km away Rooftop solar Brindley Honda, West Street - Solar Pv System Planning application in · 190 kW
Jun 2024 4.0 km away Rooftop solar Mander Square, Mander Centre - Solar Panels Approved, not yet built · 410 kW
May 2023 4.1 km away Battery storage Ebstree Road, Trysull - Battery Energy Storage Approved, not yet built · 50 MW
Nov 2024 4.1 km away Battery storage Ebstree Road, Trysull, Seisdon - Battery Energy Storage Approved, not yet built · 100 MW
Nov 2025 4.1 km away Rooftop solar Homebase, St Johns Retail Park - Solar Panels Approved, not yet built · 350 kW
Aug 2025 4.3 km away Solar farm Balliol Business Park, Balliol Road - Solar Panels Approved, not yet built · 170 kW
Mar 2024 4.3 km away Road and street works within 1 km 7 permitted works running now or planned, 5 of them major.
Major, planned School Road, Wolverhampton Utility asset works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 400 m away Major Mount Road, Wolverhampton Remedial works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 400 m away Major, planned Church Road, Wolverhampton Utility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 450 m away Major, planned Wood Road, Wolverhampton Utility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 450 m away Major Ormes Lane, Wolverhampton Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 700 m away Minor Farleigh Road, Perton Disconnection or alteration of supply · STAFFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away Minor The Parkway, Perton Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 10.1 km away Decided decided May 2020 11.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wolverhampton EfW (energy from waste, 4.3 km); Jaguar Land Rover (rooftop solar, 5.9 km); Pepperhill Solar Farm - Solar Farm & Battery Storage (solar farm, 6.5 km); Pepperhill Solar Farm - Solar Farm & Battery Storage (battery storage, 6.5 km); Land East of Lawn Lane (solar farm, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.