Country England and Wales › Region West Midlands › Council Dudley › Neighbourhood West Coseley › Postcode WV14 9HL What's changing near WV14 9HL Within 2 km, around West Coseley in Dudley. Building, planning, schools, transport, prices and crime.
283 new homes completed within 2 km, last 2 years
103 homes given permission on brownfield sites since 2021
-8.0% like-for-like prices in West Coseley, 2024 → 2025 (council +4.2%)
+9% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed flats · Oct 2026
planned Oct 2026 2.0 km away New homes 11 new homes completed houses · Sep 2026 – Oct 2026
planned Oct 2026 1.4 km away New homes 18 new homes completed houses · Jun 2026 – Oct 2026
planned Oct 2026 1.6 km away New homes 45 new homes completed houses · Nov 2024 – Jun 2026
Jun 2026 1.7 km away New homes 5 new homes completed houses · Jun 2026
Jun 2026 950 m away New homes 40 new homes completed houses · Nov 2025 – Jun 2026
Jun 2026 1.6 km away New homes 8 new homes completed houses · Apr 2026
Apr 2026 1.9 km away New homes 17 new homes completed houses · Dec 2025 – Mar 2026
Mar 2026 2.0 km away New homes 13 new homes completed houses · Jun 2025 – Dec 2025
Dec 2025 1.7 km away New homes 26 new homes completed houses · Jun 2025 – Nov 2025
Nov 2025 1.8 km away Planning permission Permission for 6 homes THE RAINBOW COMMUNITY CENTRE, 49, RAINBOW STREET, COSELEY, BILSTON, WV14 8SX (full planning permission) Jul 2025 1.9 km away 11 homes extended 2021–2025, typically adding 19 m²
21 since energy certificates began (2008)
0 in WV14 9HL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 7 storm overflows within 2 km
202 hours of spills in 2025 between them (typical neighbourhood: about 36)
94 spill events counted
Severn Trent Water Dock Meadow Cso into Bilston/Darlaston Brook 59 spills, 173 hours in 2025
1.9 km away Severn Trent Water Dock Meadow Cso into Bilston/Darlaston Brook 14 spills, 16 hours in 2025
1.9 km away Severn Trent Water Gorge Road Cso into Tributary Of Swan Brook 5 spills, 8 hours in 2025
600 m away Severn Trent Water Anchor Lane Storm Overflow into Bilston Brook 14 spills, 5 hours in 2025
1.6 km away Severn Trent Water Dudley - Jesson Road (Cso) into Tipton Brook 2 spills, 0 hours in 2025
800 m away Severn Trent Water Upper Gornal Water Reclam Work Cso into Trib Of Swan Brook 0 spills, 0 hours in 2025
1.1 km away Severn Trent Water Bean Road Cso into Tributary Of Swan Brook 0 spills, 0 hours in 2025
1.6 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 82 planned, approved or being built and 13 running (218 MW between them). Those within 5 km are on the map above.
Battery storage Sedgley Road West - Micro Energy Storage Approved, not yet built · 200 kW
Jan 2026 2.0 km away Rooftop solar Joseph Ash Galvanising, Springvale Avenue - Solar PV System Approved, not yet built · 170 kW
Feb 2023 2.0 km away Rooftop solar Sharps Bedrooms, Springvale Avenue - Solar Panels Approved, not yet built · 2 MW
Aug 2022 2.4 km away Rooftop solar Springvale Avenue - Solar PV Panels Approved, not yet built · 600 kW
Nov 2023 2.5 km away Rooftop solar Ellowes Hall Sports College, Stickley Lane - Solar Panels Approved, not yet built · 440 kW
Feb 2026 2.6 km away Battery storage Upper Church Lane - Energy Storage Facility Approved, not yet built · 200 kW
Sept 2025 2.9 km away Rooftop solar Dudley College, The Broadway - Solar Panels Approved, not yet built · 220 kW
Dec 2025 3.2 km away Rooftop solar Tenpin Dudley, Castlegate Way - Solar Panels Approved, not yet built · 200 kW
Sept 2023 3.3 km away Rooftop solar Moorcroft Drive, Moorcroft Park - Solar Panels Approved, not yet built · 1 MW
Nov 2025 4.3 km away Rooftop solar Huf Uk, New Road - Solar Panels Planning application in · 370 kW
Jan 2024 4.5 km away Road and street works within 1 km 5 permitted works running now or planned, 3 of them major.
Major, planned Hurst Road, Coseley Highway repair and maintenance works · DUDLEY METROPOLITAN BOROUGH COUNCIL · Stop/go boards
Nov 2026 to Nov 2026 600 m away Major, planned Shaw Road, Coseley Highway repair and maintenance works · DUDLEY METROPOLITAN BOROUGH COUNCIL · Road closure
Nov 2026 to Nov 2026 800 m away Major, planned Mason Street, Coseley New service connection · National Grid Electricity Distribution (West Midlands) · Road closure
Nov 2026 to Dec 2026 850 m away Standard Mason Street, Coseley New service connection · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away Standard Green Street, Coseley Highway improvement works · DUDLEY METROPOLITAN BOROUGH COUNCIL · Two-way signals
Nov 2026 to Nov 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 12.4 km away Decided decided May 2020 16.1 km away Decided decided Oct 2013 22.9 km away Decided decided May 2020 28.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Anchor Lane Energy Centre (battery storage, 1.5 km); Himley Wood Landfill Site (landfill gas, 4.3 km); Golds Hill - Battery Storage (battery storage, 4.6 km); Dudley EfW (energy from waste, 4.6 km); Oldbury (energy from waste, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.