Country England and Wales › Region West Midlands › Council Wolverhampton › Neighbourhood Bilston North West › Postcode WV13 3EH What's changing near WV13 3EH Within 2 km, around Bilston North West in Wolverhampton. Building, planning, schools, transport, prices and crime.
91 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.4% like-for-like prices in Bilston North West, 2024 → 2025 (council +5.4%)
+11% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 11 new homes completed houses · Aug 2026
Aug 2026 1.4 km away New homes 13 new homes completed houses · Jun 2026
Jun 2026 600 m away New homes 6 new homes completed flats · May 2026
May 2026 400 m away New homes 12 new homes completed houses · Jun 2025 – Nov 2025
Nov 2025 500 m away New homes 9 new homes completed houses · Apr 2025
Apr 2025 1.5 km away New homes 6 new homes completed houses · Apr 2025
Apr 2025 1.5 km away New school Jan 2021 450 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
17 homes extended 2021–2025, typically adding 21 m²
26 since energy certificates began (2008)
2 in WV13 3EH itself
Extended certificate 2026 Extended certificate 2013 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 9 storm overflows within 2 km
14 hours of spills in 2025 between them (typical neighbourhood: about 36)
16 spill events counted
Severn Trent Water Old Watery Lane Cso into Waddens Brook 5 spills, 7 hours in 2025
1.4 km away Severn Trent Water Keyway Darlaston Lane/Owen Road Cso into Darlston Brook 3 spills, 4 hours in 2025
1.3 km away Severn Trent Water Bilston - Bunkers Hill Lane (Cso) into Unnamed Drain 3 spills, 1 hours in 2025
800 m away Severn Trent Water Stow Heath (Bilston College) Cso into River Tame Tunnel (Wolv' Arm) 3 spills, 1 hours in 2025
2.0 km away Severn Trent Water Portobello - Willenhall Rd Cso into River Tame 1 spills, 1 hours in 2025
800 m away Severn Trent Water Darlaston - Wolverhampton Street (Cso) into Bilston/Darlaston Brook 1 spills, 0 hours in 2025
1.2 km away Severn Trent Water Portobello - Dilloways/Waite Rd Cso into River Tame 0 spills, 0 hours in 2025
250 m away Severn Trent Water Willenhall - Walsall Rd-Acorn St So into River Tame 0 spills, 0 hours in 2025
1.5 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 75 planned, approved or being built and 14 running (228 MW between them). Those within 5 km are on the map above.
Rooftop solar Middleton Paper Company, Portobello Works - Solar Panels Approved, not yet built · 530 kW
Feb 2026 550 m away Rooftop solar Scanmetals Limited, Bilston Lane - Solar Panels Approved, not yet built · 520 kW
May 2023 1.3 km away Rooftop solar Arnold Clark, Bearing Drive - Solar panels Approved, not yet built · 380 kW
Apr 2024 1.8 km away Solar farm Bowmans Harbour Solar Farm Being built · 7 MW
Apr 2022 2.5 km away Rooftop solar Springvale Avenue - Solar PV Panels Approved, not yet built · 600 kW
Nov 2023 2.6 km away Rooftop solar Sharps Bedrooms, Springvale Avenue - Solar Panels Approved, not yet built · 2 MW
Aug 2022 2.7 km away Rooftop solar Joseph Ash Galvanising, Springvale Avenue - Solar PV System Approved, not yet built · 170 kW
Feb 2023 3.1 km away Rooftop solar Willenhall E Act School Academy, Furzebank Way - Solar Panels Approved, not yet built · 160 kW
Aug 2023 3.2 km away Rooftop solar Moorcroft Drive, Moorcroft Park - Solar Panels Approved, not yet built · 1 MW
Nov 2025 3.4 km away Rooftop solar Cat & Kittens Lane, Slade Heath - Solar Photovoltaics Panels Planning application in · 220 kW
Jun 2022 3.6 km away Road and street works within 1 km 5 permitted works running now or planned, 4 of them major.
Major, planned Aston Road, Willenhall Utility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026 800 m away Major Union Street, Willenhall New service connection · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026 800 m away Major, planned Parkside Avenue, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Road closure
Dec 2026 to Dec 2026 850 m away Major, planned Dartmouth Crescent, Wolverhampton Utility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 900 m away Minor Gomer Street, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 700 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 8.0 km away Decided decided May 2020 12.3 km away Decided decided Oct 2013 26.2 km away Decided decided May 2020 28.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: EPSRC Willenhall (battery storage, 700 m); Anchor Lane Energy Centre (battery storage, 3.6 km); Bloxwich Battery (battery storage, 3.8 km); Wolverhampton EfW (energy from waste, 4.6 km); Golds Hill - Battery Storage (battery storage, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.