Country England and Wales › Region West Midlands › Council Walsall › Neighbourhood Willenhall Park › Postcode WV13 1ED What's changing near WV13 1ED Within 2 km, around Willenhall Park in Walsall. Building, planning, schools, transport, prices and crime.
54 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.5% like-for-like prices in Willenhall Park, 2024 → 2025 (council +4.7%)
+8% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 13 new homes completed houses · Jun 2026
Jun 2026 950 m away New homes 6 new homes completed flats · May 2026
May 2026 1.2 km away New homes 12 new homes completed houses · Jun 2025 – Nov 2025
Nov 2025 1.2 km away New school Apr 2025 1.4 km away New school Jun 2024 1.5 km away New school Jan 2021 1.1 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
17 homes extended 2021–2025, typically adding 27 m²
22 since energy certificates began (2008)
1 in WV13 1ED itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 8 storm overflows within 2 km
42 hours of spills in 2025 between them (typical neighbourhood: about 36)
17 spill events counted
Severn Trent Water Willenhall Cso into Darlaston Brook 5 spills, 25 hours in 2025
1.6 km away Severn Trent Water Old Watery Lane Cso into Waddens Brook 5 spills, 7 hours in 2025
1.5 km away Severn Trent Water Darlaston - Bentley Road South Cso into River Tame 3 spills, 6 hours in 2025
2.0 km away Severn Trent Water Keyway Darlaston Lane/Owen Road Cso into Darlston Brook 3 spills, 4 hours in 2025
1.6 km away Severn Trent Water Portobello - Willenhall Rd Cso into River Tame 1 spills, 1 hours in 2025
1.7 km away Severn Trent Water Willenhall - Walsall Rd-Acorn St So into River Tame 0 spills, 0 hours in 2025
650 m away Severn Trent Water Merrills Hall Lane Cso into Waddens & Bentley Fl R Culvert 0 spills, 0 hours in 2025
1.1 km away Severn Trent Water Portobello - Dilloways/Waite Rd Cso into River Tame 0 spills, 0 hours in 2025
1.4 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 72 planned, approved or being built and 11 running (215 MW between them). Those within 5 km are on the map above.
Rooftop solar Scanmetals Limited, Bilston Lane - Solar Panels Approved, not yet built · 520 kW
May 2023 1.1 km away Rooftop solar Middleton Paper Company, Portobello Works - Solar Panels Approved, not yet built · 530 kW
Feb 2026 1.4 km away Rooftop solar Arnold Clark, Bearing Drive - Solar panels Approved, not yet built · 380 kW
Apr 2024 1.7 km away Rooftop solar Willenhall E Act School Academy, Furzebank Way - Solar Panels Approved, not yet built · 160 kW
Aug 2023 1.7 km away Rooftop solar West Walsall E Act Academy, Primley Avenue - Solar Panels Approved, not yet built · 210 kW
Oct 2023 2.8 km away Solar farm Bowmans Harbour Solar Farm Being built · 7 MW
Apr 2022 3.0 km away Rooftop solar The Food Warehouse, Reedswood Way - Solar Panels Approved, not yet built · 150 kW
Dec 2025 3.3 km away Energy from waste BH Energy Gap - Waste Energy Plant, The 3Rs Being built · 49 MW
Jan 2025 3.3 km away Rooftop solar AC Steels, Fryers Road - Solar Panels Approved, not yet built · 240 kW
Dec 2024 3.4 km away Rooftop solar Manor Hospital, Moat Road - Solar Panels Approved, not yet built · 400 kW
Mar 2026 3.5 km away Road and street works within 1 km 7 permitted works running now or planned, 6 of them major.
Major, planned Regent Street, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Road closure
Nov 2026 to Nov 2026 350 m away Major, planned Frederick William Street, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Road closure
Nov 2026 to Nov 2026 400 m away Major, planned Elm Street, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Road closure
Nov 2026 to Nov 2026 400 m away Major, planned Elm Street, Willenhall Utility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026 400 m away Major, planned Albion Road, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Road closure
Nov 2026 to Nov 2026 450 m away Major Union Street, Willenhall New service connection · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026 750 m away Minor Gomer Street, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 7.0 km away Decided decided May 2020 11.6 km away Decided decided Oct 2013 27.2 km away Decided decided May 2020 28.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: EPSRC Willenhall (battery storage, 850 m); Bloxwich Battery (battery storage, 2.7 km); Anchor Lane Energy Centre (battery storage, 5.1 km); Wolverhampton EfW (energy from waste, 5.1 km); Golds Hill - Battery Storage (battery storage, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.