Country England and Wales › Region West Midlands › Council Walsall › Neighbourhood New Invention › Postcode WV12 5RT What's changing near WV12 5RT Within 2 km, around New Invention in Walsall. Building, planning, schools, transport, prices and crime.
15 new homes completed within 2 km, last 2 years
39 homes given permission on brownfield sites since 2021
+6.3% like-for-like prices in New Invention, 2024 → 2025 (council +4.7%)
-24% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school Apr 2025 950 m away New school Jun 2024 1.9 km away Planning permission Mar 2024 950 m away Planning permission Dec 2023 600 m away New school Apr 2023 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
13 homes extended 2021–2025, typically adding 21 m²
30 since energy certificates began (2008)
2 in WV12 5RT itself
Extended certificate 2022 Extended certificate 2022 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 4 storm overflows within 2 km
71 hours of spills in 2025 between them (typical neighbourhood: about 36)
33 spill events counted
Severn Trent Water Sneyd Lane Cso into Sneyd Brook 15 spills, 37 hours in 2025
2.0 km away Severn Trent Water Leamore Lane Cso into Tributary Of Sneyd Brook 18 spills, 34 hours in 2025
1.7 km away Severn Trent Water Wednesfield - Amos Ln-Bellamy Ln So into Waddens Brook 0 spills, 0 hours in 2025
1.7 km away Severn Trent Water Merrills Hall Lane Cso into Waddens & Bentley Fl R Culvert 0 spills, 0 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 65 planned, approved or being built and 13 running (245 MW between them). Those within 5 km are on the map above.
Rooftop solar Willenhall E Act School Academy, Furzebank Way - Solar Panels Approved, not yet built · 160 kW
Aug 2023 1.3 km away Energy from waste BH Energy Gap - Waste Energy Plant, The 3Rs Being built · 49 MW
Jan 2025 2.2 km away Rooftop solar AC Steels, Fryers Road - Solar Panels Approved, not yet built · 240 kW
Dec 2024 2.3 km away Rooftop solar Arnold Clark, Bearing Drive - Solar panels Approved, not yet built · 380 kW
Apr 2024 2.5 km away Rooftop solar Scanmetals Limited, Bilston Lane - Solar Panels Approved, not yet built · 520 kW
May 2023 2.6 km away Rooftop solar Middleton Paper Company, Portobello Works - Solar Panels Approved, not yet built · 530 kW
Feb 2026 2.8 km away Rooftop solar The Food Warehouse, Reedswood Way - Solar Panels Approved, not yet built · 150 kW
Dec 2025 3.0 km away Solar farm Bognop Road, Essington - Solar Farm & Battery Energy Storage Planning application in · 35 MW
Nov 2024 3.1 km away Battery storage Bognop Road, Essington - Solar Farm & Battery Energy Storage Planning application in
Nov 2024 3.1 km away Rooftop solar West Walsall E Act Academy, Primley Avenue - Solar Panels Approved, not yet built · 210 kW
Oct 2023 3.4 km away Road and street works within 1 km 3 permitted works running now or planned.
Minor Bentley Lane, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 600 m away Minor Roundlea Close, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Give and take
Oct 2026 to Oct 2026 650 m away Minor Moore Road, Willenhall Highway repair and maintenance works · WALSALL METROPOLITAN BOROUGH COUNCIL · Give and take
Oct 2026 to Oct 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 5.7 km away Decided decided May 2020 10.4 km away Decided decided May 2020 28.7 km away Decided decided Oct 2013 28.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: EPSRC Willenhall (battery storage, 2.5 km); Bloxwich Battery (battery storage, 2.8 km); Wolverhampton EfW (energy from waste, 5.6 km); Anchor Lane Energy Centre (battery storage, 6.7 km); Golds Hill - Battery Storage (battery storage, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.