Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
10spill events counted
Severn Trent Water
Waterhead Drive Csointo Tributary Of Waterhead Brook10 spills, 5 hours in 2025
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Featherstone East & Essington: +28% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.4% in two years.
Valiant Way, Pendeford - Solar PanelsApproved, not yet built · 880 kW
Mar 2023 3.4 km away
Solar farm
Four Ashes, Deepmore Lane - Solar FarmApproved, not yet built · 23 MW
Jul 2024 4.0 km away
Running nearest: Land East of Lawn Lane (solar farm, 3.4 km); Jaguar Land Rover (rooftop solar, 3.5 km); Barr Farm (solar farm, 3.8 km); Four Ashes EfW (energy from waste, 3.9 km); Wolverhampton EfW (energy from waste, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.