Country England and Wales › Region West Midlands › Council South Staffordshire › Neighbourhood Cheslyn Hay › Postcode WS6 6NT What's changing near WS6 6NT Within 2 km, around Cheslyn Hay in South Staffordshire. Building, planning, schools, transport, prices and crime.
67 new homes completed within 2 km, last 2 years
224 homes given permission on brownfield sites since 2021
-1.7% like-for-like prices in Cheslyn Hay, 2024 → 2025 (council +2.8%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed 1 flats, 14 houses · Jun 2025 – Dec 2025
Dec 2025 1.4 km away New homes 5 new homes completed houses · Oct 2025
Oct 2025 400 m away New homes 7 new homes completed houses · Nov 2024
Dec 2024 1.6 km away New homes 32 new homes completed flats · Nov 2024
Nov 2024 200 m away Planning permission Jan 2024 1.9 km away Planning permission Aug 2023 400 m away Planning permission Jul 2023 250 m away Planning permission Jun 2023 1.8 km away Planning permission 10 homes extended 2021–2025, typically adding 38 m²
17 since energy certificates began (2008)
1 in WS6 6NT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 6 storm overflows within 2 km
215 hours of spills in 2025 between them (typical neighbourhood: about 36)
122 spill events counted
Severn Trent Water Littlewood Sewage Pumping Station into Wyrley Brook 15 spills, 118 hours in 2025
1.5 km away Severn Trent Water Station Road/103 Walsall Road Cso into Wyrley Brook 29 spills, 30 hours in 2025
700 m away Severn Trent Water Norton Canes - Washbrook Lane (Sso) into Ditch Trib. Of The River Trent 15 spills, 24 hours in 2025
1.7 km away Severn Trent Water No.266 Walsall Road Cso into Tributary Of Wyrley Brook 26 spills, 23 hours in 2025
750 m away Severn Trent Water Lingfield Drive Cso into Tributary Of Wyrley Brook 21 spills, 16 hours in 2025
1.0 km away Severn Trent Water Hilton Lane Cso into Tributary Of Wyrley Brook 16 spills, 4 hours in 2025
750 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 35 planned, approved or being built and 9 running (90 MW between them). Those within 5 km are on the map above.
Solar farm Finning Limited, Watling Street - Solar Farm Planning application in
Jul 2023 2.4 km away Battery storage Hobble Lane, Great Wyrley - Battery Energy Storage Approved, not yet built · 50 MW
Feb 2025 2.4 km away Rooftop solar Steel Processing Midlands, Burntwood Business Park - Solar Panels Approved, not yet built · 160 kW
Mar 2024 4.9 km away Solar farm Bognop Road, Essington - Solar Farm & Battery Energy Storage Planning application in · 35 MW
Nov 2024 5.2 km away Battery storage Bognop Road, Essington - Solar Farm & Battery Energy Storage Planning application in
Nov 2024 5.2 km away Battery storage Upper Latherford Farm, Latherford Lane - Battery Energy Storage System Approved, not yet built · 50 MW
Oct 2024 5.8 km away Battery storage Energyst Rental Solutions, Station Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 5.9 km away Energy from waste BH Energy Gap - Waste Energy Plant, The 3Rs Being built · 49 MW
Jan 2025 6.4 km away Rooftop solar AC Steels, Fryers Road - Solar Panels Approved, not yet built · 240 kW
Dec 2024 6.5 km away Battery storage Element Court, Hilton Cross Business Park - Micro Energy Storage Facility Approved, not yet built · 200 kW
Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major, planned Station Road, Great Wyrley Highway repair and maintenance works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 800 m away Minor Darges Lane, Great Wyrley Utility asset works · VODAFONE GROUP · Multi-way signals
Oct 2026 to Oct 2026 700 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 4.9 km away Decided decided May 2020 7.9 km away Decided decided Jun 2025 25.3 km away Decided decided Mar 2014 25.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Poplars Anaerobic Digestion Facility (Waste AD) (anaerobic digestion, 2.0 km); Highfields South Landfill Gas (landfill gas, 6.9 km); Four Ashes EfW (energy from waste, 7.4 km); Barr Farm (solar farm, 7.9 km); Rodbaston (wind farm, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.