9 new homes completed within 2 km, last 2 years
8 homes given permission on brownfield sites since 2021
+5.6% like-for-like prices in Hawks Green, 2024 → 2025 (council +4.4%)
-9% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
18 homes extended 2021–2025, typically adding 26 m²
27 since energy certificates began (2008)
1 in WS11 7WF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 12 storm overflows within 2 km
86 hours of spills in 2025 between them (typical neighbourhood: about 36)
102 spill events counted
Severn Trent Water Cannock Road Sewage Pumping Station into Newlands Brook 8 spills, 31 hours in 2025
950 m away Severn Trent Water Cannock Road - Cemetry Road Cso into Ridings Brook 39 spills, 25 hours in 2025
800 m away Severn Trent Water Cheviot Rise Cso into Ridings Brook 13 spills, 13 hours in 2025
1.4 km away Severn Trent Water Blackford Cso into Ridings Brook 20 spills, 8 hours in 2025
800 m away Severn Trent Water Cannock Road - Kingsway Cso into Tributary Of Ridings Brook 18 spills, 7 hours in 2025
1.5 km away Severn Trent Water Blackford Cso into Ridings Brook 1 spills, 2 hours in 2025
800 m away Severn Trent Water Heath Hayes - Cleeton St/Cannock Rd (Cso) into Newlands Brook 1 spills, 0 hours in 2025
950 m away Severn Trent Water Heath Hayes - Boston Close (Cso) into River Trent 1 spills, 0 hours in 2025
900 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 19 planned, approved or being built and 5 running (36 MW between them). Those within 5 km are on the map above.
Solar farm Finning Limited, Watling Street - Solar Farm Planning application in
Jul 2023 3.5 km away Rooftop solar Steel Processing Midlands, Burntwood Business Park - Solar Panels Approved, not yet built · 160 kW
Mar 2024 4.4 km away Battery storage Hobble Lane, Great Wyrley - Battery Energy Storage Approved, not yet built · 50 MW
Feb 2025 5.5 km away Rooftop solar Pillaton Foods, Cannock Road - Solar Panels Approved, not yet built · 700 kW
Apr 2024 6.5 km away Battery storage Upper Latherford Farm, Latherford Lane - Battery Energy Storage System Approved, not yet built · 50 MW
Oct 2024 7.2 km away Battery storage Lions Den, Hammerwich - Battery Storage Facility Approved, not yet built · 100 MW
Jul 2025 7.4 km away Solar farm Bognop Road, Essington - Solar Farm & Battery Energy Storage Planning application in · 35 MW
Nov 2024 8.1 km away Battery storage Bognop Road, Essington - Solar Farm & Battery Energy Storage Planning application in
Nov 2024 8.1 km away Battery storage Energyst Rental Solutions, Station Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 8.2 km away Battery storage Hawkesyard Estate, Rugeley Road - Battery Energy Storage Planning application in · 100 MW
Road and street works within 1 km 5 permitted works running now or planned, 3 of them major.
Major, planned Newlands Lane, Cannock Utility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026 900 m away Major, planned Langholm Drive, Cannock Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 1000 m away Major Langholm Drive, Cannock Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 1000 m away Standard Gladstone Road, Cannock New service connection · National Grid Electricity Distribution (West Midlands) · Multi-way signals
Oct 2026 to Nov 2026 950 m away Standard Hednesford Road, Cannock New service connection · National Grid Electricity Distribution (West Midlands) · Multi-way signals
Oct 2026 to Nov 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 7.2 km away Decided decided May 2020 8.4 km away Decided decided Mar 2014 23.5 km away Decided decided Jun 2025 23.6 km away Decided Meaford Energy Centre Generating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016 28.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Poplars Anaerobic Digestion Facility (Waste AD) (anaerobic digestion, 1.4 km); Rodbaston (wind farm, 8.1 km); Four Ashes EfW (energy from waste, 8.4 km); Highfields South Landfill Gas (landfill gas, 8.8 km); Barr Farm (solar farm, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.