Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
334hours of spills in 2025 between them (typical neighbourhood: about 36)
83spill events counted
Severn Trent Water
Hallow Stwinto Laughern Brook33 spills, 260 hours in 2025
1.7 km away
Severn Trent Water
Jct. Hylton Road/Henwick Road Csointo River Severn46 spills, 74 hours in 2025
1.6 km away
Severn Trent Water
Ombersley Rd/Checketts Lane Jcn Csointo River Severn4 spills, 1 hours in 2025
18 planned, approved or being built and 5 running (105 MW between them). Those within 5 km are on the map above.
Rooftop solar
Perdiswell Leisure Centre, Bilford Road - Solar PanelsApproved, not yet built · 240 kW
Sept 2024 1.4 km away
Solar farm
Fitcher Brook Solar FarmPlanning application in · 19 MW
Dec 2023 1.8 km away
Rooftop solar
Tudor Grange Academy, Bilford Road - Solar PanelsApproved, not yet built · 230 kW
Apr 2024 1.8 km away
Solar farm
Vamix Factory, Martley Road - Solar PanelsApproved, not yet built · 380 kW
Jul 2023 2.1 km away
Solar farm
Vandemoortele Worcester - Solar FarmPlanning application in · 580 kW
Oct 2024 2.1 km away
Rooftop solar
St Martins Gate Car Park, St Martins Gate - Solar PV SystemsPlanning application in
Jun 2024 2.7 km away
Rooftop solar
Bosch Thermotecnology UK Limited, Cotswold Way - Solar PV PanelsApproved, not yet built · 930 kW
Dec 2022 3.4 km away
Rooftop solar
David Lloyd Leisure, Warriors Way - Solar PanelsApproved, not yet built · 420 kW
Sept 2023 4.9 km away
Battery storage
Worcester Rugby Football Club, Hindlip - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Mar 2025 4.9 km away
Rooftop solar
Hornhill Road, Nunnery Way - Solar PanelsApproved, not yet built · 150 kW
Apr 2026 5.0 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major, planned
Sandys Road, WorcesterNew service connection · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026 850 m away
Standard
Winterburn Road, WorcesterHighway repair and maintenance works · WORCESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away
Minor
Beech Avenue, WorcesterRemedial works · CADENT GAS LIMITED · Multi-way signals
Nov 2026 to Nov 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Northwick: +25% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.1% in two years.