Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
256hours of spills in 2025 between them (typical neighbourhood: about 36)
41spill events counted
Severn Trent Water
Powick Stwinto Careys Brook18 spills, 167 hours in 2025
1.3 km away
Severn Trent Water
Callow End - Lower Ferry Lane (Cso)into River Severn23 spills, 89 hours in 2025
1.0 km away
Severn Trent Water
Kempsey Stwinto River Severn0 spills, 0 hours in 2025
18 planned, approved or being built and 5 running (56 MW between them). Those within 5 km are on the map above.
Battery storage
Whitehouse Farm Energy BarnApproved, not yet built · 40 MW
Nov 2017 4.2 km away
Rooftop solar
St Martins Gate Car Park, St Martins Gate - Solar PV SystemsPlanning application in
Jun 2024 5.5 km away
Energy from waste
Hangmans LaneBeing built · 5 MW
Feb 2019 5.7 km away
Rooftop solar
Woodbury Lane, Norton - Solar PanelsApproved, not yet built · 180 kW
Apr 2024 5.8 km away
Rooftop solar
Hornhill Road, Nunnery Way - Solar PanelsApproved, not yet built · 150 kW
Apr 2026 6.7 km away
Solar farm
Vamix Factory, Martley Road - Solar PanelsApproved, not yet built · 380 kW
Jul 2023 6.7 km away
Solar farm
Vandemoortele Worcester - Solar FarmPlanning application in · 580 kW
Oct 2024 6.7 km away
Rooftop solar
The Malvern Splash, Priory Road - Solar panelsApproved, not yet built · 200 kW
Jul 2024 6.9 km away
Rooftop solar
Perdiswell Leisure Centre, Bilford Road - Solar PanelsApproved, not yet built · 240 kW
Sept 2024 7.8 km away
Rooftop solar
Tudor Grange Academy, Bilford Road - Solar PanelsApproved, not yet built · 230 kW
Apr 2024 7.9 km away
Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major
Upton Road, Callow EndUtility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026 650 m away
Standard
Upper Ferry Lane, Callow EndUtility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
application due April 2027 24.0 km away
Decided
M5 Junction 10 Improvements SchemeHighways · In Gloucestershire, 5 miles to the south of Tewkesbury and 4 miles to the north-west of Cheltenham.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Colletts Green, Callow End & Hanley: +27% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.7% in two years.