Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
70hours of spills in 2025 between them (typical neighbourhood: about 36)
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 18.2 km away
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Stopgate Lane, Simonswood - Solar PanelsApproved, not yet built · 730 kW
Oct 2022 5.4 km away
Wind farm
Deans Lane Wind TurbineApproved, not yet built
Nov 2021 6.0 km away
Running nearest: Sanko Gosei Solar Panels (rooftop solar, 1.8 km); Lathom (Pilkington Technical Centre) (solar farm, 2.8 km); Lathom (Pilkington Technical Centre) Battery Storage (battery storage, 2.8 km); Holiday Moss Landfill Gas Scheme (landfill gas, 4.5 km); Holiday Moss Gas to Energy II (landfill gas, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.