Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
126hours of spills in 2025 between them (typical neighbourhood: about 36)
46spill events counted
United Utilities
St Mary'S Road Csointo Trib. Of Ince Brook Via Sws41 spills, 112 hours in 2025
1.2 km away
United Utilities
Old Fold Road Csointo Borsdane Brook2 spills, 10 hours in 2025
1.7 km away
United Utilities
Manchester Rd/Hope Stinto River Croal3 spills, 5 hours in 2025
31 planned, approved or being built and 7 running (75 MW between them). Those within 5 km are on the map above.
Battery storage
Scot Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Jan 2026 1.9 km away
Rooftop solar
Royal Albert Edward Infirmary, Wigan Lane - Solar PanelsPlanning application in · 170 kW
Mar 2026 2.8 km away
Rooftop solar
Wigan Youth Zone - Solar PanelsPlanning application in · 190 kW
Aug 2024 3.8 km away
Rooftop solar
Bradley Hall Trading Estate, Bradley Lane - Solar PanelsApproved, not yet built · 420 kW
Sept 2024 3.8 km away
Battery storage
Orrell Street Battery Energy Storage FacilityApproved, not yet built · 50 MW
Feb 2026 4.2 km away
Rooftop solar
Tesco, Mansell WayApproved, not yet built · 450 kW
Nov 2020 4.5 km away
Rooftop solar
Tesco Superstore, Mansell Way - Solar PanelsPlanning application in · 1 MW
Apr 2026 4.5 km away
Anaerobic digestion
Wigan Lane - Anaerobic Digester UnitApproved, not yet built
Mar 2026 4.5 km away
Rooftop solar
Westgate House, Green Street - Solar PanelsApproved, not yet built · 150 kW
Jul 2024 4.5 km away
Rooftop solar
Wigan Investment Centre - Solar panelsApproved, not yet built · 200 kW
Aug 2021 4.7 km away
Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Aspull & Red Rock: +36% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.1% in two years.