Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
2,494hours of spills in 2025 between them (typical neighbourhood: about 36)
440spill events counted
Yorkshire Water
Horbury Stwinto River Calder82 spills, 928 hours in 2025
1.9 km away
Yorkshire Water
Bridge Road Csointo Smithy Brook101 spills, 525 hours in 2025
600 m away
Yorkshire Water
Albion Mills Csointo River Calder52 spills, 376 hours in 2025
300 m away
Yorkshire Water
Horbury Bridge Spsinto River Calder63 spills, 246 hours in 2025
250 m away
Yorkshire Water
Horbury Stwinto River Calder47 spills, 182 hours in 2025
1.9 km away
Yorkshire Water
Healey Road Ossett Csointo River Calder58 spills, 153 hours in 2025
1.7 km away
Yorkshire Water
Netherton Csointo Pits Beck Culverted33 spills, 42 hours in 2025
1.6 km away
Yorkshire Water
Thornhill Road Csointo Smithy Brook3 spills, 34 hours in 2025
25 planned, approved or being built and 2 running (6 MW between them). Those within 5 km are on the map above.
Solar farm
Lady Ings Farm, Middlestown - Solar Photovoltaic FarmApproved, not yet built · 50 MW
Nov 2022 1.2 km away
Solar farm
Horbury Wastewater Treatment Works, Dudfleet Lane - Solar ArrayPlanning application in · 310 kW
Jul 2024 1.6 km away
Solar farm
Horbury Wastewater Treatment Works - Solar PanelsPlanning application in · 310 kW
Jul 2023 1.8 km away
Solar farm
Dewsbury Sewage, Clough Lane - Solar PanelsApproved, not yet built · 1 MW
May 2026 2.6 km away
Rooftop solar
Ossett Health Village, Kingsway - Solar PV PanelsApproved, not yet built · 200 kW
Nov 2023 2.6 km away
Solar farm
Owlers Farm, Wakefield Road - Solar FarmApproved, not yet built · 20 MW
May 2026 3.1 km away
Rooftop solar
Arnold Clark Wakefield Motorstore, Peel Avenue - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 3.3 km away
Solar farm
New Hall Farm, New Hall Lane - Solar FarmApproved, not yet built · 22 MW
Jun 2025 3.3 km away
Rooftop solar
Unit 11, Albert Drive - Solar PanelsApproved, not yet built · 220 kW
Jul 2023 3.4 km away
Solar farm
H M Prison & Young Offender Institution - Solar Photovoltaic PanelsApproved, not yet built · 210 kW
Dec 2021 3.7 km away
Road and street works within 1 km
7 permitted works running now or planned, 4 of them major.
Major, planned
Storrs Hill Road, WakefieldHighway improvement works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away
Major
Storrs Hill Road, WakefieldHighway improvement works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away
Major, planned
Storrs Hill Road, OssettHighway improvement works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 500 m away
Major
Storrs Hill Road, OssettHighway improvement works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 500 m away
Minor
Gervase Road, WakefieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 950 m away
Minor
Sandy Lane, WakefieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 1000 m away
Minor
Shepstye Road, WakefieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Ossett South East & Horbury Bridge: +32% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.
Low Farm, Flockton - Solar Photovoltaic FarmApproved, not yet built · 50 MW
Aug 2022 4.2 km away
Battery storage
Low Farm, Flockton - Battery StorageApproved, not yet built
Aug 2022 4.2 km away
Running nearest: Haigh Hall Solar Farm (solar farm, 5.9 km); Soothills Landfill (landfill gas, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due in February 2026 27.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.