What's changing near WF3 3TX
Within 2 km, around Robin Hood, Lofthouse & Middleton Lane in Leeds. Building, planning, schools, transport, prices and crime.
66new homes completed within 2 km, last 2 years
7homes given permission on brownfield sites since 2021
+5.0%like-for-like prices in Robin Hood, Lofthouse & Middleton Lane, 2024 → 2025 (council +3.8%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Nov 2025 – Jul 2026
Jul 2026
1.2 km away - New homes
20 new homes completedhouses · Dec 2024 – Jun 2026
Jun 2026
1.1 km away - New homes
19 new homes completedhouses · Dec 2024 – Dec 2025
Dec 2025
1.3 km away - New homes
9 new homes completedhouses · Oct 2024 – Aug 2025
Aug 2025
1.3 km away - Planning permissionMay 2021
850 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
16homes extended 2021–2025, typically adding 21 m²
20since energy certificates began (2008)
1in WF3 3TX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
109hours of spills in 2025 between them (typical neighbourhood: about 36)
25spill events counted
- Yorkshire Water
The Falls Spsinto Bowling Beck19 spills, 106 hours in 2025
1.7 km away - Yorkshire Water
Thorpe Road Csointo Throstle Carr Beck6 spills, 3 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
62 planned, approved or being built and 10 running (32 MW between them). Those within 5 km are on the map above.
- Battery storage
Westfield Road, Carlton - Battery StorageApproved, not yet built · 50 MW
Jul 2025
750 m away - Rooftop solar
Clapgate Primary School, Cranmore Drive - Solar PV PanelsApproved, not yet built · 230 kW
Mar 2023
1.7 km away - Rooftop solar
Sharp Lane Primary School, Sharp Lane - Solar PanelsApproved, not yet built · 210 kW
Jun 2023
1.8 km away - Rooftop solar
Vehicle Testing Station, Patrick Green - Solar PanelsApproved, not yet built · 250 kW
Oct 2025
2.7 km away - Rooftop solar
Manheim Car Auctions, Rothwell - Solar PanelsApproved, not yet built · 180 kW
Oct 2025
2.7 km away - Rooftop solar
J J Food Service, Middleton Grove - Solar Pv PanelsApproved, not yet built · 340 kW
Sept 2023
3.9 km away - Rooftop solar
Network House, Beeston - Solar PanelsApproved, not yet built · 410 kW
Jan 2024
4.0 km away - Energy from waste
Skelton Grange – Energy Recovery FacilityBeing built · 49 MW
May 2023
4.1 km away - Rooftop solar
Cockburn School, Gipsy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Nov 2025
4.2 km away - Rooftop solar
George Mann Way, Hunslet - Solar PanelsApproved, not yet built
Feb 2026
4.2 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Hopefield Gardens, LeedsNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Jan 2027 to Feb 2027
450 m away - Major
Hopefield Gardens, LeedsNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Jan 2027 to Feb 2027
450 m away - Standard
Leeds Road, WakefieldNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026
500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2015
14.6 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
14.6 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
15.1 km away - Decideddecided Mar 2015
18.4 km away - Examination
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Knostrop WWTW AD (anaerobic digestion, 4.5 km); Knostrop Sewage Treatment Works (anaerobic digestion, 4.8 km); LVF Packaging - Solar Panel (rooftop solar, 5.0 km); Skelton Grange Landfill (landfill gas, 5.2 km); Haigh Hall Solar Farm (solar farm, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.