Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
339hours of spills in 2025 between them (typical neighbourhood: about 36)
71spill events counted
Yorkshire Water
Aberford Road Csointo River Calder46 spills, 188 hours in 2025
2.0 km away
Yorkshire Water
Stanley Moor Road Spsinto Lee Moor Beck (Via Sw Sewer)25 spills, 151 hours in 2025
57 planned, approved or being built and 9 running (30 MW between them). Those within 5 km are on the map above.
Rooftop solar
Vehicle Testing Station, Patrick Green - Solar PanelsApproved, not yet built · 250 kW
Oct 2025 1.9 km away
Battery storage
Westfield Road, Carlton - Battery StorageApproved, not yet built · 50 MW
Jul 2025 2.2 km away
Solar farm
Fieldhead Hospital, Ouchthorpe Lane - Solar CarportPlanning application in · 300 kW
Jun 2026 2.5 km away
Rooftop solar
Pinderfields General Hospital, Aberford Road - Solar PV PanelsApproved, not yet built
Oct 2025 3.1 km away
Rooftop solar
Headways, Unit 3 - Solar PanelsApproved, not yet built · 1 MW
Oct 2024 3.2 km away
Rooftop solar
Sharp Lane Primary School, Sharp Lane - Solar PanelsApproved, not yet built · 210 kW
Jun 2023 3.8 km away
Rooftop solar
Clapgate Primary School, Cranmore Drive - Solar PV PanelsApproved, not yet built · 230 kW
Mar 2023 3.8 km away
Rooftop solar
Phoenix Healthcare Distribution Centre - Solar PanelsApproved, not yet built · 3 MW
Feb 2024 4.1 km away
Battery storage
Phoenix Healthcare Distribution Centre - Battery StorageApproved, not yet built · 3 MW
Feb 2024 4.1 km away
Rooftop solar
Manheim Car Auctions, Rothwell - Solar PanelsApproved, not yet built · 180 kW
Oct 20254.3 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major, planned
Baker Lane, WakefieldHighway improvement works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away
Standard
Meadow Close, WakefieldNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Feb 2027 to Feb 2027 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Outwood East: +35% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.1% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.