Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
288hours of spills in 2025 between them (typical neighbourhood: about 36)
89spill events counted
Yorkshire Water
Wide Lane Morley Csointo Owler Beck58 spills, 176 hours in 2025
1.9 km away
Yorkshire Water
The Falls Spsinto Bowling Beck19 spills, 106 hours in 2025
1.3 km away
Yorkshire Water
East Ardsley No 2 Csointo C. Trib Of Lingwell Gate Beck6 spills, 3 hours in 2025
61 planned, approved or being built and 10 running (32 MW between them). Those within 5 km are on the map above.
Rooftop solar
Sharp Lane Primary School, Sharp Lane - Solar PanelsApproved, not yet built · 210 kW
Jun 2023 2.2 km away
Rooftop solar
Clapgate Primary School, Cranmore Drive - Solar PV PanelsApproved, not yet built · 230 kW
Mar 2023 2.6 km away
Rooftop solar
Cockburn School, Gipsy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Nov 2025 3.1 km away
Battery storage
Westfield Road, Carlton - Battery StorageApproved, not yet built · 50 MW
Jul 2025 3.4 km away
Rooftop solar
Network House, Beeston - Solar PanelsApproved, not yet built · 410 kW
Jan 2024 3.7 km away
Rooftop solar
J J Food Service, Middleton Grove - Solar Pv PanelsApproved, not yet built · 340 kW
Sept 2023 3.7 km away
Rooftop solar
Vehicle Testing Station, Patrick Green - Solar PanelsApproved, not yet built · 250 kW
Oct 2025 4.8 km away
Solar farm
Fieldhead Hospital, Ouchthorpe Lane - Solar CarportPlanning application in · 300 kW
Jun 2026 5.1 km away
Rooftop solar
Manheim Car Auctions, Rothwell - Solar PanelsApproved, not yet built · 180 kW
Oct 2025 5.2 km away
Rooftop solar
George Mann Way, Hunslet - Solar PanelsApproved, not yet built
Feb 2026 5.2 km away
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Back Wood Street, WakefieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Tingley East & East Ardsley: +29% over five years (2020 → 2025).
Council tax list: 120 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.7% in two years.
Unit 11, Albert Drive - Solar PanelsApproved, not yet built · 220 kW
Jul 2023 5.4 km away
Solar farm
Owlers Farm, Wakefield Road - Solar FarmApproved, not yet built · 20 MW
May 2026 5.4 km away
Running nearest: Haigh Hall Solar Farm (solar farm, 2.9 km); Soothills Landfill (landfill gas, 4.0 km); LVF Packaging - Solar Panel (rooftop solar, 5.7 km); Knostrop WWTW AD (anaerobic digestion, 5.8 km); TF and JH Braime Holdings Factory (rooftop solar, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due in February 2026 23.6 km away
Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
decided Mar 2024 25.7 km away
Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 27.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.