Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
354hours of spills in 2025 between them (typical neighbourhood: about 36)
172spill events counted
Yorkshire Water
Waterton Road Csointo Gill Syke56 spills, 159 hours in 2025
1.6 km away
Yorkshire Water
Bective Mills Csointo Alverthorpe Beck37 spills, 68 hours in 2025
450 m away
Yorkshire Water
Wrenthorpe Csointo Balne Beck16 spills, 51 hours in 2025
600 m away
Yorkshire Water
Whinney Moor Pub House Csointo Tributary Of The River Calder26 spills, 49 hours in 2025
1.8 km away
Yorkshire Water
Flanshaw Road Csointo Alverthorpe Beck15 spills, 14 hours in 2025
500 m away
Yorkshire Water
Wrenthorpe Lane Csointo Balne Beck15 spills, 11 hours in 2025
1.1 km away
Yorkshire Water
Flanshaw Lane Csointo Alverthorpe Beck4 spills, 1 hours in 2025
400 m away
Yorkshire Water
Derwent Road No 2 Csointo Alverthorpe Beck3 spills, 1 hours in 2025
44 planned, approved or being built and 2 running (6 MW between them). Those within 5 km are on the map above.
Rooftop solar
Unit 11, Albert Drive - Solar PanelsApproved, not yet built · 220 kW
Jul 2023 1.3 km away
Rooftop solar
Buzz Bingo, Denby Dale Road - Solar PanelsPlanning application in · 150 kW
Jun 2026 2.0 km away
Solar farm
Fieldhead Hospital, Ouchthorpe Lane - Solar CarportPlanning application in · 300 kW
Jun 2026 2.3 km away
Rooftop solar
Pinderfields General Hospital, Aberford Road - Solar PV PanelsApproved, not yet built
Oct 2025 2.5 km away
Solar farm
Owlers Farm, Wakefield Road - Solar FarmApproved, not yet built · 20 MW
May 2026 2.9 km away
Rooftop solar
Carshop Wakefield, Calder Island Way - Solar PanelsApproved, not yet built · 150 kW
Dec 2025 3.1 km away
Rooftop solar
Ossett Health Village, Kingsway - Solar PV PanelsApproved, not yet built · 200 kW
Nov 2023 3.9 km away
Solar farm
Horbury Wastewater Treatment Works, Dudfleet Lane - Solar ArrayPlanning application in · 310 kW
Jul 2024 3.9 km away
Rooftop solar
Arnold Clark Wakefield Motorstore, Peel Avenue - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 4.1 km away
Battery storage
Neil Fox Way - Battery StoragePlanning application in · 100 MW
Jul 2022 4.3 km away
Road and street works within 1 km
12 permitted works running now or planned, 6 of them major.
Major
Peacock Avenue, WakefieldHighway repair and maintenance works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026 350 m away
Major
Silcoates Street, WakefieldOptional permit (no fee) e.g. for traffic management etc · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 550 m away
Major, planned
Flanshaw Road, WakefieldHighway repair and maintenance works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 650 m away
Major
Flanshaw Road, WakefieldHighway repair and maintenance works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Batley Road, WakefieldHighway improvement works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 250 m away
Standard
Saffron Court, WakefieldNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Jan 2027 to Jan 2027 450 m away
Standard
Major infrastructure projects within 30 km
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Alverthorpe & Flanshaw: +29% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.8% in two years.
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
decided Feb 2026 29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.