Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
17storm overflows within 2 km
956hours of spills in 2025 between them (typical neighbourhood: about 36)
319spill events counted
Yorkshire Water
Heckmondwike No 2 Csointo River Spen23 spills, 200 hours in 2025
44 planned, approved or being built and 3 running (16 MW between them). Those within 5 km are on the map above.
Rooftop solar
Sainsburys, Railway Street - Solar PanelsApproved, not yet built · 370 kW
Apr 2026 2.8 km away
Rooftop solar
Calder Textiles, Dewsbury Mills - Solar Photovoltaic EquipmentApproved, not yet built
Aug 2023 3.2 km away
Rooftop solar
Wesco Aircraft Emea, Leeds Road - Solar PhotovoltaicApproved, not yet built · 340 kW
Apr 2024 3.7 km away
Solar farm
Howden Clough Landfill, Howden Clough Road - Solar FarmPlanning application in · 2 MW
Jan 2026 4.2 km away
Battery storage
Former Howden Clough, Howden Clough Road - Battery UnitsApproved, not yet built · 2 MW
Apr 2023 4.3 km away
Battery storage
Station Road - Energy Storage FacilityApproved, not yet built
Mar 2022 4.5 km away
Solar farm
Dewsbury Sewage, Clough Lane - Solar PanelsApproved, not yet built · 1 MW
May 2026 5.0 km away
Rooftop solar
Unit S, Gildersome Spur, Gildersome - Solar PanelsApproved, not yet built · 150 kW
Oct 2022 5.0 km away
Rooftop solar
Stone Pits Lane, MorleyApproved, not yet built
Mar 2021 5.1 km away
Rooftop solar
Gildersome Spur - Solar PV PanelsApproved, not yet built · 160 kW
Oct 2022 5.2 km away
Road and street works within 1 km
13 permitted works running now or planned, 13 of them major.
Major, planned
Common Road, BatleyHighway repair and maintenance works · KIRKLEES COUNCIL · Two-way signals
Oct 2026 to Nov 2026 250 m away
Major
Common Road, BatleyHighway repair and maintenance works · KIRKLEES COUNCIL · Two-way signals
Oct 2026 to Nov 2026 250 m away
Major, planned
Moorside Road, DewsburyUtility asset works · YORKSHIRE WATER · Road closure
Mar 2027 to Apr 2027 850 m away
Major
Moorside Road, DewsburyUtility asset works · YORKSHIRE WATER · Road closure
Mar 2027 to Apr 2027 850 m away
Major, planned
Moor End Lane, DewsburyUtility asset works · YORKSHIRE WATER · Two-way signals
Feb 2027 to Mar 2027 850 m away
Major
Moor End Lane, DewsburyUtility asset works · YORKSHIRE WATER · Two-way signals
Feb 2027 to Mar 2027 850 m away
Major, planned
Chapel Lane, HeckmondwikeUtility asset works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 900 m away
Major, planned
Low Cliff Walk, HeckmondwikeUtility asset works · YORKSHIRE WATER · Road closure
Nov 2026 to Dec 2026 900 m away
Major
Low Cliff Walk, HeckmondwikeUtility asset works · YORKSHIRE WATER · Road closure
Nov 2026 to Dec 2026 900 m away
Major, planned
Moorside Avenue, Dewsbury
Major infrastructure projects within 30 km
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 28.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Staincliffe & Healey: +37% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.7% in two years.