Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
7hours of spills in 2025 between them (typical neighbourhood: about 36)
13spill events counted
Yorkshire Water
Hightown Road Csointo Syke Beck13 spills, 7 hours in 2025
49 planned, approved or being built and 2 running (11 MW between them). Those within 5 km are on the map above.
Rooftop solar
Wesco Aircraft Emea, Leeds Road - Solar PhotovoltaicApproved, not yet built · 340 kW
Apr 2024 2.4 km away
Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024 3.9 km away
Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023 4.1 km away
Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025 4.2 km away
Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024 4.3 km away
Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024 4.8 km away
Battery storage
Station Road - Energy Storage FacilityApproved, not yet built
Mar 2022 5.2 km away
Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026 5.3 km away
Rooftop solar
Huddersfield Town Sports Academy, Leeds Road - Solar PV PanelsApproved, not yet built · 150 kW
Sept 2025 5.4 km away
Rooftop solar
United Anodisers, Red Doles Lane - Solar PanelsBeing built · 310 kW
Mar 2023 5.6 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
Major, planned
Hartshead Lane, LiversedgeNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Nov 2026 to Nov 2026 1000 m away
Major
Hartshead Lane, LiversedgeNew service connection · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026 1000 m away
Minor
Windy Bank Lane, LiversedgeRemedial works · YORKSHIRE WATER · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 23.7 km away
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 29.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Heckmondwike Town, Norristhorpe & Roberttown: +40% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.