Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
1,143hours of spills in 2025 between them (typical neighbourhood: about 36)
255spill events counted
Yorkshire Water
Listing Mill Farm Csointo Tributary Of The River Spen74 spills, 604 hours in 2025
1.5 km away
Yorkshire Water
St Peg Lane Csointo River Spen39 spills, 209 hours in 2025
1.8 km away
Yorkshire Water
Morrisons Car Park Csointo River Spen43 spills, 160 hours in 2025
48 planned, approved or being built and 3 running (16 MW between them). Those within 5 km are on the map above.
Rooftop solar
Wesco Aircraft Emea, Leeds Road - Solar PhotovoltaicApproved, not yet built · 340 kW
Apr 2024 1.8 km away
Battery storage
Station Road - Energy Storage FacilityApproved, not yet built
Mar 2022 4.2 km away
Rooftop solar
Calder Textiles, Dewsbury Mills - Solar Photovoltaic EquipmentApproved, not yet built
Aug 2023 4.8 km away
Rooftop solar
Sainsburys, Railway Street - Solar PanelsApproved, not yet built · 370 kW
Apr 2026 5.1 km away
Rooftop solar
Huddersfield Audi, Leeds Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2025 5.4 km away
Rooftop solar
Ellis Hill Trading Estate, Leeds Road - Solar PanelsApproved, not yet built · 180 kW
Jul 2024 5.5 km away
Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024 5.7 km away
Solar farm
Howden Clough Landfill, Howden Clough Road - Solar FarmPlanning application in · 2 MW
Jan 2026 5.8 km away
Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023 5.8 km away
Battery storage
Former Howden Clough, Howden Clough Road - Battery UnitsApproved, not yet built · 2 MW
Apr 2023 5.8 km away
Road and street works within 1 km
6 permitted works running now or planned, 5 of them major.
Major, planned
Wormald Street, LiversedgeUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 800 m away
Major
Wormald Street, LiversedgeUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 800 m away
Major
Balmfield Crescent, LiversedgeUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Sept 2026 to Oct 2026 950 m away
Major, planned
Garden Avenue, LiversedgeHighway improvement works · KIRKLEES COUNCIL · Road closure
Sept 2026 to Oct 2026 1000 m away
Major
Garden Avenue, LiversedgeHighway improvement works · KIRKLEES COUNCIL · Road closure
Sept 2026 to Oct 2026 1000 m away
Standard
Balmfield Crescent, LiversedgeUtility repair and maintenance works · NORTHERN GAS NETWORKS · No carriageway incursion
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 25.9 km away
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 27.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Heckmondwike Town, Norristhorpe & Roberttown: +40% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.