Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
19storm overflows within 2 km
1,365hours of spills in 2025 between them (typical neighbourhood: about 36)
276spill events counted
Yorkshire Water
Spenborough Spsinto River Calder And River Spen51 spills, 426 hours in 2025
800 m away
Yorkshire Water
Yws Unknown Sites Defaultinto Calder41 spills, 225 hours in 2025
600 m away
Yorkshire Water
Thornhill Dewsbury No1 Csointo River Calder36 spills, 173 hours in 2025
1.5 km away
Yorkshire Water
Ravens Huddersfield Rd Csointo River Calder27 spills, 122 hours in 2025
600 m away
Yorkshire Water
Yws Unknown Sites Defaultinto River Calder21 spills, 85 hours in 2025
600 m away
Yorkshire Water
Fir Cottage Csointo River Calder7 spills, 69 hours in 2025
1.8 km away
Yorkshire Water
Thornhill Syphon Csointo River Calder16 spills, 67 hours in 2025
1.5 km away
Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database11 spills, 56 hours in 2025
Thornhill Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 150 m away
Minor
Forge Lane, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 200 m away
Minor
Station Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 200 m away
Minor
Savile Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 200 m away
Minor
Caledonian Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 400 m away
Minor
Headfield Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 550 m away
Minor
Major infrastructure projects within 30 km
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Dewsbury Moor Lower & Westtown: +27% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.4% in two years.