What's changing near WF12 9NY
Within 2 km, around Dewsbury Savile Town & Thornhill Lees in Kirklees. Building, planning, schools, transport, prices and crime.
29new homes completed within 2 km, last 2 years
28homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Dewsbury Savile Town & Thornhill Lees, 2024 → 2025 (council +4.0%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Apr 2026
Apr 2026
1.5 km away - New homes
5 new homes completedhouses · Nov 2025
Nov 2025
1.8 km away - New homes
5 new homes completedhouses · Oct 2025
Oct 2025
2.0 km away - New homes
7 new homes completedhouses · Jul 2025
Jul 2025
2.0 km away - Planning permissionOct 2024
1.5 km away - Planning permissionMar 2024
1.6 km away - New schoolMar 2024
1.7 km away - School closed
School closed: Institute of Islamic EducationOther independent school, other independent school (closure)
Jan 2023
450 m away - Planning permissionNov 2022
2.0 km away
6homes extended 2021–2025, typically adding 81 m²
48since energy certificates began (2008)
2in WF12 9NY itself
- Extendedcertificate 2014
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
18storm overflows within 2 km
1,296hours of spills in 2025 between them (typical neighbourhood: about 36)
269spill events counted
- Yorkshire Water
Spenborough Spsinto River Calder And River Spen51 spills, 426 hours in 2025
1.1 km away - Yorkshire Water
Yws Unknown Sites Defaultinto Calder41 spills, 225 hours in 2025
750 m away - Yorkshire Water
Thornhill Dewsbury No1 Csointo River Calder36 spills, 173 hours in 2025
1.2 km away - Yorkshire Water
Ravens Huddersfield Rd Csointo River Calder27 spills, 122 hours in 2025
650 m away - Yorkshire Water
Yws Unknown Sites Defaultinto River Calder21 spills, 85 hours in 2025
650 m away - Yorkshire Water
Thornhill Syphon Csointo River Calder16 spills, 67 hours in 2025
1.2 km away - Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database11 spills, 56 hours in 2025
650 m away - Yorkshire Water
Brewery Lane Csointo Culverted Trib Of River Calder14 spills, 51 hours in 2025
350 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
38 planned, approved or being built and 3 running (16 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Calder Textiles, Dewsbury Mills - Solar Photovoltaic EquipmentApproved, not yet built
Aug 2023
300 m away - Rooftop solar
Sainsburys, Railway Street - Solar PanelsApproved, not yet built · 370 kW
Apr 2026
1.3 km away - Solar farm
Dewsbury Sewage, Clough Lane - Solar PanelsApproved, not yet built · 1 MW
May 2026
2.2 km away - Battery storage
Station Road - Energy Storage FacilityApproved, not yet built
Mar 2022
3.3 km away - Rooftop solar
Ossett Health Village, Kingsway - Solar PV PanelsApproved, not yet built · 200 kW
Nov 2023
3.4 km away - Solar farm
Lady Ings Farm, Middlestown - Solar Photovoltaic FarmApproved, not yet built · 50 MW
Nov 2022
4.0 km away - Solar farm
Low Farm, Flockton - Solar Photovoltaic FarmApproved, not yet built · 50 MW
Aug 2022
4.2 km away - Battery storage
Low Farm, Flockton - Battery StorageApproved, not yet built
Aug 2022
4.2 km away - Solar farm
Owlers Farm, Wakefield Road - Solar FarmApproved, not yet built · 20 MW
May 2026
4.3 km away - Solar farm
New Hall Farm, New Hall Lane - Solar FarmApproved, not yet built · 22 MW
Jun 2025
4.7 km away - Rooftop solar
Road and street works within 1 km
17 permitted works running now or planned, 3 of them major.
- Major
Fall Lane, DewsburyOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Road closure
Jan 2027 to Apr 2027
850 m away - Major
Thornhill Road, DewsburyOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Road closure
Jan 2027 to Apr 2027
850 m away - Major
Thornhill Road, DewsburyWorks for Rail Purposes · NETWORK RAIL · Multi-way signals
May 2026 to Oct 2026
850 m away - Minor
Savile Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
150 m away - Minor
Thornhill Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
200 m away - Minor
Station Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
200 m away - Minor
Forge Lane, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
200 m away - Minor
Caledonian Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
300 m away - Minor
Headfield Road, DewsburyHighway repair and maintenance works · KIRKLEES COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
450 m away - Minor
Major infrastructure projects within 30 km
- Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
23.4 km away - Decideddecided Oct 2015
23.5 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
23.7 km away - Decideddecided Mar 2015
26.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Soothills Landfill (landfill gas, 4.9 km); Haigh Hall Solar Farm (solar farm, 5.5 km); Vine Street EfW (energy from waste, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.