Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,197hours of spills in 2025 between them (typical neighbourhood: about 36)
230spill events counted
Yorkshire Water
Ings Lane Storm Tanksinto River Aire97 spills, 949 hours in 2025
1.6 km away
Yorkshire Water
Wheldon Road Csointo River Aire38 spills, 87 hours in 2025
1.0 km away
Yorkshire Water
Castleford Stwinto River Aire23 spills, 72 hours in 2025
1.8 km away
Yorkshire Water
Carr Lane Spsinto Carr Beck34 spills, 38 hours in 2025
1.2 km away
Yorkshire Water
All Saints Church Csointo River Aire22 spills, 27 hours in 2025
1.3 km away
Yorkshire Water
Wheldale Farm Csointo River Aire12 spills, 20 hours in 2025
1.9 km away
Yorkshire Water
James Street Spsinto River Aire4 spills, 4 hours in 2025
1.3 km away
Yorkshire Water
Ings Lane Storm Tanksinto River Aire0 spills, 0 hours in 2025
Redhill Avenue, CastlefordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Oct 2026 450 m away
Standard
Parklands, CastlefordUtility repair and maintenance works · YORKSHIRE WATER · Give and take
Oct 2026 to Oct 2026 450 m away
Standard
Bridge Street, CastlefordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Oct 2026 700 m away
Immediate - urgent
Leeds Road, CastlefordHighway repair and maintenance works · CITY OF WAKEFIELD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Glasshoughton: +31% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.6% in two years.
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
DHL, Waindyke Way - Solar panelsApproved, not yet built · 360 kW
Mar 2025 4.5 km away
Battery storage
Rawfield Lane - Battery Energy Storage SystemApproved, not yet built · 200 MW
Aug 2025 4.8 km away
Running nearest: Ferrybridge Multifuel 2 (FM2) (energy from waste, 3.8 km); Ferrybridge Multifuel 1 (FM1) (energy from waste, 3.8 km); Kirkhaw Lane - Battery Storage Energy (battery storage, 4.2 km); Kirkhaw Lane (battery storage, 4.2 km); Knottingley A (solar farm, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due in February 2026 10.4 km away
Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 14.1 km away
Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
decided Feb 2026 19.0 km away
Decided
Helios Renewable Energy ProjectGenerating Stations · Land to the south west of the village of Camblesforth and to the north of the village of Hirst Court
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
decided Mar 2024 20.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.