Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
122hours of spills in 2025 between them (typical neighbourhood: about 36)
75spill events counted
United Utilities
Gaskell Street Csointo Sutton Brook Trib Sankey Brook38 spills, 62 hours in 2025
1.9 km away
United Utilities
Warrington New Road (42060)into Hardshaw Brook18 spills, 34 hours in 2025
1.9 km away
United Utilities
Jackson Street Csointo Hardshaw Brook13 spills, 23 hours in 2025
1.9 km away
United Utilities
Warrington New Road Csointo Hardshaw Brook6 spills, 2 hours in 2025
50 planned, approved or being built and 10 running (49 MW between them). Those within 5 km are on the map above.
Energy from waste
Sutton Heath RoadApproved, not yet built · 15 MW
Mar 2017 700 m away
Hydrogen
St Helens Green Hydrogen FacilityApproved, not yet built · 15 MW
May 2025 700 m away
Rooftop solar
Mere Grange, Leaside - Solar PanelsApproved, not yet built · 220 kW
Jun 2025 950 m away
Battery storage
Biffa Electricity Generating Compound, Burtonhead Road - Battery StorageApproved, not yet built · 1 MW
Oct 2022 1.1 km away
Rooftop solar
Arnold Clark Renault, Delphwood Drive - Solar PanelsApproved, not yet built · 200 kW
Mar 2026 1.1 km away
Rooftop solar
The Sutton Academy, Elton Head Road - Solar PanelsApproved, not yet built · 380 kW
Sept 2025 1.2 km away
Rooftop solar
St Helens Rugby League Stadium, Peasley Cross Lane - Solar PanelsApproved, not yet built · 400 kW
Jan 2023 1.6 km away
Battery storage
Sutton Manor - Battery Storage FacilityApproved, not yet built · 57 MW
Sept 2022 1.9 km away
Rooftop solar
Lea Green Business Park, Eurolink - Solar PanelsApproved, not yet built · 310 kW
Jul 2025 2.0 km away
Rooftop solar
Lea Green Business Park, Eurolink - Solar PanelsApproved, not yet built · 550 kW
Jun 2024 2.0 km away
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Lowfield Lane, St HelensUtility repair and maintenance works · United Utilities Water Ltd · Multi-way signals
Jan 2027 to Jan 2027 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 15.0 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 17.9 km away
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
11 new homes completedhouses · Feb 2026 – May 2026
May 2026 1.8 km away
New homes
8 new homes completedhouses · Feb 2026 – May 2026
May 2026 1.5 km away
New homes
15 new homes completedhouses · Feb 2026 – Mar 2026
Mar 2026 1.8 km away
New homes
7 new homes completedhouses · Feb 2026
Feb 2026 1.7 km away
New homes
17 new homes completedhouses · Apr 2025 – Jan 2026
Jan 2026 750 m away
New homes
60 new homes completedhouses · Nov 2024 – Nov 2025
Nov 2025 1.3 km away
New homes
15 new homes completedhouses · Jun 2025 – Oct 2025
Oct 2025 650 m away
New homes
21 new homes completedhouses · Nov 2024 – May 2025
May 2025 800 m away
New homes
6 new homes completedhouses · May 2025
May 2025 600 m away
New homes
24 new homes completedflats · Feb 2025
Feb 2025 1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 31 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Queens Park Health And Fitness - Solar PanelsApproved, not yet built · 320 kW
Feb 2025 2.2 km away
Rooftop solar
College Street - Solar PanelsApproved, not yet built · 1 MW
Jun 2024 2.6 km away
Running nearest: Amazon Omega Business Park (rooftop solar, 6.3 km); Billinge Hill Quarry Landfill Scheme (landfill gas, 7.9 km); PROMISED LAND FARM (wind farm, 8.3 km); Holiday Moss Landfill Gas Scheme (landfill gas, 8.7 km); Holiday Moss Gas to Energy II (landfill gas, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 26.2 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
application due April 2027 30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.