What's changing near WA5 7WT
Within 2 km, around Kingswood & Whittle Hall in Warrington. Building, planning, schools, transport, prices and crime.
230new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
0.0%like-for-like prices in Kingswood & Whittle Hall, 2024 → 2025 (council +3.9%)
+15%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
56 new homes completed8 flats, 48 houses · Feb 2025 – Sep 2026
Sept 2026
400 m away - New homes
36 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
400 m away - New homes
33 new homes completedhouses · Oct 2025 – Sep 2026
Sept 2026
250 m away - New homes
12 new homes completed2 flats, 10 houses · Oct 2024 – May 2026
May 2026
600 m away - New homes
32 new homes completedhouses · May 2025 – May 2026
May 2026
450 m away - New homes
11 new homes completedhouses · Dec 2024 – Mar 2026
Mar 2026
400 m away - New homes
6 new homes completedhouses · Jan 2025 – Oct 2025
Oct 2025
300 m away - New homes
37 new homes completedhouses · Oct 2024 – Aug 2025
Aug 2025
550 m away - New homes
5 new homes completedhouses · Mar 2025 – May 2025
May 2025
350 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 25 m²
12since energy certificates began (2008)
1in WA5 7WT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
46 planned, approved or being built and 11 running (58 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Fairchild Road, Burtonwood & Westbrook - Solar PanelsApproved, not yet built · 1 MW
Oct 2023
550 m away - Rooftop solar
Dominos Pizza, Skyline Drive - Solar PanelsApproved, not yet built · 990 kW
Feb 2023
850 m away - Rooftop solar
The Hut Group, Skyline Drive - Solar ArrayApproved, not yet built · 7 MW
Jul 2025
1.1 km away - Rooftop solar
The Hut Group, Skyline Drive - Solar Photovoltaic PanelsApproved, not yet built · 2 MW
Nov 2025
1.1 km away - Rooftop solar
Lockheed Road, Burtonwood & Westbrook - Solar panelsApproved, not yet built · 2 MW
Aug 2023
1.2 km away - Rooftop solar
City Plumbing, Lockheed Road - Solar PanelsApproved, not yet built · 640 kW
Jun 2024
1.2 km away - Rooftop solar
Arnold Clark Automobiles, Europa Boulevard - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
1.5 km away - Solar farm
Haweswater Car Park - Solar CanopyApproved, not yet built · 870 kW
Oct 2024
1.9 km away - Rooftop solar
Warrington Teaching Hospital, Lovely Lane - Solar PanelsApproved, not yet built · 450 kW
May 2026
2.8 km away - Rooftop solar
Christeyns Food Hygiene, Cameron Court - Solar panelsApproved, not yet built · 190 kW
Dec 2024
2.9 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Minor
Falconers Green, WarringtonRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
400 m away - Minor
Harrogate Close, WarringtonRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027
5.7 km away - Pre-applicationapplication due Dec 2027
12.8 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
13.7 km away - Decideddecided May 2015
17.7 km away - Decideddecided Aug 2014
17.8 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
20.0 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Amazon Omega Business Park (rooftop solar, 1.2 km); Warrington Home Solar Scheme (rooftop solar, 3.7 km); Arpley Landfill Scheme 'A' (landfill gas, 4.3 km); Arpley Landfill Scheme 'B' (landfill gas, 4.3 km); Daresbury Science Park - Solar Array (solar farm, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.