Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
265hours of spills in 2025 between them (typical neighbourhood: about 36)
59spill events counted
United Utilities
Walton Psinto Manchester Ship Canal25 spills, 233 hours in 2025
1.9 km away
United Utilities
Knutsford Rd/Grammar School Rd Csointo Manchester Ship Canal24 spills, 19 hours in 2025
1.3 km away
United Utilities
Ellesmere Road Cso 481tiinto Manchester Ship Canal9 spills, 10 hours in 2025
1.1 km away
United Utilities
Warrington/Grappenhallinto Manchester Ship Canal1 spills, 3 hours in 2025
32 planned, approved or being built and 9 running (36 MW between them). Those within 5 km are on the map above.
Battery storage
Grappenhall Village Sports Club, Stockton Lane - Energy Storage SystemApproved, not yet built · 200 kW
Jul 2025 600 m away
Solar farm
Former St Michaels Golf CourseBeing built · 1 MW
Jan 2020 2.4 km away
Rooftop solar
Spire Cheshire Hospital, Fir Tree Close - Solar PV SystemsApproved, not yet built · 160 kW
Apr 2024 3.4 km away
Rooftop solar
Halliwell Jones Stadium, Winwick Road - Solar PanelsApproved, not yet built · 340 kW
Mar 2026 3.6 km away
Rooftop solar
Warrington Teaching Hospital, Lovely Lane - Solar PanelsApproved, not yet built · 450 kW
May 2026 4.0 km away
Rooftop solar
Beamont Collegiate Academy, Long Lane - Solar PanelsApproved, not yet built · 240 kW
Jan 2026 4.6 km away
Rooftop solar
Warrington Vehicle Centre, Hardwick Grange - Solar PanelsApproved, not yet built · 700 kW
Jun 2024 4.9 km away
Rooftop solar
Britplas Commercial Windows, Kingsland Grange - Solar PanelsApproved, not yet built · 350 kW
Oct 2025 5.1 km away
Rooftop solar
Mercedes Benz, Juniper Lane - Solar PanelsApproved, not yet built · 200 kW
Oct 2022 5.4 km away
Rooftop solar
Christeyns Food Hygiene, Cameron Court - Solar panelsApproved, not yet built · 190 kW
Dec 20246.1 km away
Road and street works within 1 km
7 permitted works running now or planned.
Standard
Farm Lane, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Dec 2026 to Jan 2027 50 m away
Standard
Heyes Lane, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Dec 2026 to Jan 2027 100 m away
Standard
Hinton Crescent, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away
Standard
Clydesdale Road, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 250 m away
Standard
Chester Road, WarringtonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away
Standard
Waverley Avenue, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 500 m away
Standard
Greenway, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 7.9 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 13.3 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 13.4 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stockton Heath & Hillcliffe: +22% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.4% in two years.
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility.
application due July 2027 25.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.