Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
38 planned, approved or being built and 7 running (65 MW between them). Those within 5 km are on the map above.
Solar farm
Silver Lane, Risley - Solar FarmApproved, not yet built · 5 MW
Aug 2023 950 m away
Rooftop solar
Genesis Centre, Garrett Field - Solar PV SystemApproved, not yet built · 330 kW
Jan 2025 1.9 km away
Rooftop solar
Mercedes Benz, Juniper Lane - Solar PanelsApproved, not yet built · 200 kW
Oct 2022 3.1 km away
Rooftop solar
Britplas Commercial Windows, Kingsland Grange - Solar PanelsApproved, not yet built · 350 kW
Oct 2025 3.2 km away
Rooftop solar
Warrington Vehicle Centre, Hardwick Grange - Solar PanelsApproved, not yet built · 700 kW
Jun 2024 3.3 km away
Battery storage
Biffa Waste Services, Manchester Road - Battery StorageApproved, not yet built
Sept 2023 3.6 km away
Rooftop solar
CSG Cadishead Weee, Liverpool Road - Solar PanelsApproved, not yet built · 160 kW
Nov 2023 3.9 km away
Solar farm
Duckinfield Farm, Hurst Lane - Solar FarmApproved, not yet built · 10 MW
May 2026 4.4 km away
Rooftop solar
Ferrous Way - Solar PanelsApproved, not yet built · 290 kW
Jan 2023 4.7 km away
Rooftop solar
Ferrous Way - Solar PV ArrayApproved, not yet built · 390 kW
Mar 2025 4.7 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 15.9 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
application due April 2027 22.6 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.