Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
1,078hours of spills in 2025 between them (typical neighbourhood: about 36)
181spill events counted
United Utilities
Orford Park Cso 48087into Longford Brook29 spills, 279 hours in 2025
Fothergill Street, WarringtonDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 450 m away
Minor
Marsh House Lane, WarringtonOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Two-way signals
Jan 2027 to Jan 2027 300 m away
Minor
Marsh House Lane, WarringtonOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Two-way signals
Jan 2027 to Jan 2027 300 m away
Minor
Marsh House Lane, WarringtonOptional permit (no fee) e.g. for traffic management etc · NETWORK RAIL · Two-way signals
Jan 2027 to Jan 2027 300 m away
Minor
Padgate Lane, WarringtonRemedial works · United Utilities Water Ltd · Stop/go boards
Oct 2026 to Oct 2026 800 m away
Minor
Hilden Road, WarringtonRemedial works · United Utilities Water Ltd · Two-way signals
Oct 2026 to Oct 2026 950 m away
Minor
Winwick Road, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Lane closure
Oct 2026 to Oct 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 5.6 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 15.2 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 16.9 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Orford: +35% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.8% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.