Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
852hours of spills in 2025 between them (typical neighbourhood: about 36)
94spill events counted
United Utilities
Orford Park Cso 48087into Longford Brook29 spills, 279 hours in 2025
34 planned, approved or being built and 9 running (36 MW between them). Those within 5 km are on the map above.
Rooftop solar
Beamont Collegiate Academy, Long Lane - Solar PanelsApproved, not yet built · 240 kW
Jan 2026 1000 m away
Rooftop solar
Christeyns Food Hygiene, Cameron Court - Solar panelsApproved, not yet built · 190 kW
Dec 2024 1.6 km away
Rooftop solar
Units 2-4 Opus 9 Industrial Estate - Roof mounted solar panelsApproved, not yet built · 230 kW
May 2022 1.6 km away
Anaerobic digestion
Winwick Link Road, Winwick - Anaerobic Digestion FacilityPlanning application in · 1 MW
Jul 2025 2.0 km away
Rooftop solar
Halliwell Jones Stadium, Winwick Road - Solar PanelsApproved, not yet built · 340 kW
Mar 2026 2.3 km away
Rooftop solar
Arnold Clark Automobiles, Europa Boulevard - Solar PanelsApproved, not yet built · 230 kW
Mar 2025 3.0 km away
Rooftop solar
Britplas Commercial Windows, Kingsland Grange - Solar PanelsApproved, not yet built · 350 kW
Oct 2025 3.0 km away
Rooftop solar
Warrington Teaching Hospital, Lovely Lane - Solar PanelsApproved, not yet built · 450 kW
May 2026 3.2 km away
Rooftop solar
Genesis Centre, Garrett Field - Solar PV SystemApproved, not yet built · 330 kW
Jan 2025 3.5 km away
Rooftop solar
Warrington Vehicle Centre, Hardwick Grange - Solar PanelsApproved, not yet built · 700 kW
Road and street works within 1 km
7 permitted works running now or planned, 2 of them major.
Major
Statham Avenue, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Nov 2026 to Dec 2026 300 m away
Major
Appleby Road, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Nov 2026 400 m away
Standard
Honister Avenue, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 250 m away
Standard
Bentham Avenue, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Nov 2026 to Nov 2026 300 m away
Standard
Bowness Avenue, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 300 m away
Standard
Ambleside Crescent, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Nov 2026 to Nov 2026 350 m away
Standard
Keswick Avenue, WarringtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 4.0 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 16.4 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
Mercedes Benz, Juniper Lane - Solar PanelsApproved, not yet built · 200 kW
Oct 2022 4.6 km away
Rooftop solar
Fairchild Road, Burtonwood & Westbrook - Solar PanelsApproved, not yet built · 1 MW
Oct 2023 4.8 km away
Running nearest: Warrington Home Solar Scheme (rooftop solar, 3.5 km); Risley Sets 13 & 14 (landfill gas, 5.3 km); Risley '4' Landfill Scheme (landfill gas, 5.4 km); Amazon Omega Business Park (rooftop solar, 5.5 km); Risley (landfill gas, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
application due April 2027 22.4 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.